IAC logo
IAC Assessment: MS0114
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0114
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1998
Principal Product Mechanical Packages
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 72,000
Annual Production 52 Pieces
Production Hrs. Annual 2,080
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,442 1,366,354 kWh $0.05
Electricity Demand $14,430 4,991 kW-months/year $2.89
Electricity Fees $16,976 - $ -
Natural Gas $12,305 1,668 MMBtu $7.38
Fuel Oil #2 $3,600 147 MMBtu $24.49
TOTAL ENERGY COSTS $123,721
RECOMMENDED SAVINGS* $40,846 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,021
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Other Liquid (non-haz) Other Liquid (haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ gal $ gal $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,292
Cost:
$3,361
- - - - - - $9,292 1,259 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$9,292
1,259
MMBtu
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$463
Cost:
$710
$428 9,086 - - $35 - - - - - - - - - - - $428
9,086
kWh
-
-
kW-months/year
$35
-
$
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,444
Cost:
$892
$2,260 47,479 - - $184 - - - - - - - - - - - $2,260
47,479
kWh
-
-
kW-months/year
$184
-
$
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,750
Cost:
-
- - $9,414 3,581 - - - - - - - - - - $(-1,664) - -
-
kWh
$9,414
3,581
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
gal
$(-1,664)
-
$
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,460
Cost:
$954
$1,350 28,429 - - $110 - - - - - - - - - - - $1,350
28,429
kWh
-
-
kW-months/year
$110
-
$
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$577
Cost:
$308
$375 7,913 $118 45 $84 - - - - - - - - - - - $375
7,913
kWh
$118
45
kW-months/year
$84
-
$
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$15,435
Cost:
$2,360
- - - - - - - - - - $13,860 252 $1,575 63 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$13,860
252
gal
$1,575
63
gal
-
-
$
08: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,919
Cost:
$2,862
- - - - - - $1,919 260 - - - 2,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,919
260
MMBtu
-
-
MMBtu
-
2,000
gal
-
-
gal
-
-
$
09: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$1,506
Cost:
$4,518
$(-2,229) (-43,083) - - - - - - $3,600 147 - - - - $135 - $(-2,229)
(-43,083)
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,600
147
MMBtu
-
-
gal
-
-
gal
$135
-
$
TOTAL RECOMMENDED Savings:
$40,846
Cost:
$15,965
$2,184 49,824 $9,532 3,626 $413 - $11,211 1,519 $3,600 147 $13,860 2,252 $1,575 63 $(-1,529) - $2,184
49,824
kWh
$9,532
3,626
kW-months/year
$413
-
$
$11,211
1,519
MMBtu
$3,600
147
MMBtu
$13,860
2,252
gal
$1,575
63
gal
$(-1,529)
-
$
TOTAL IMPLEMENTED Savings:
$3,021
Cost:
$1,200
$2,635 55,392 $118 45 $268 - - - - - - - - - - - $2,635
55,392
kWh
$118
45
kW-months/year
$268
-
$
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ gal $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Other Liquid (non-haz) Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Other Liquid (non-haz) Other Liquid (haz) Personnel Changes