IAC logo
IAC Assessment: MS0115
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0115
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1998
Principal Product Non-Woven Fabrics
NAICS n/a
SIC 2297 - Nonwoven Fabrics
Sales $5,000,000-$10,000,000
# of Employees 46
Plant Area (Sq.Ft.) 43,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 5,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,034 1,472,157 kWh $0.03
Electricity Demand $31,157 3,495 kW-months/year $8.91
Electricity Fees $1,509 - $ -
Natural Gas $64,211 19,403 MMBtu $3.31
TOTAL ENERGY COSTS $158,944
RECOMMENDED SAVINGS* $522,311 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $520,010
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$130
Cost:
$335
$128 3,810 - - $2 - - - - - - - - - $128
3,810
kWh
-
-
kW-months/year
$2
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$101
Cost:
$384
$44 1,465 $55 6 $2 - - - - - - - - - $44
1,465
kWh
$55
6
kW-months/year
$2
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,226
Cost:
$1,332
- - - - - - $2,226 672 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,226
672
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$62,615
Cost:
$4,720
- - - - - - - - $146 81,000 $62,469 189,300 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$146
81,000
Tgal
$62,469
189,300
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$75
Cost:
-
- - - - - - - - - - $35 788 $40 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$35
788
lb
$40
-
$
06: 3.4155 METER WASTE WATER Savings:
$1,274
Cost:
-
- - - - - - - - - - - - $1,274 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
$1,274
-
$
07: 3.4155 METER WASTE WATER Savings:
$68
Cost:
$25
- - - - - - - - - - - - $68 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
$68
-
$
08: 4.5110 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$181,522
Cost:
$600,000
- - - - - - - - - - - - $181,522 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
$181,522
-
$
09: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$274,300
Cost:
$60,000
- - - - - - - - - - - - $274,300 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
$274,300
-
$
TOTAL RECOMMENDED Savings:
$522,311
Cost:
$666,796
$172 5,275 $55 6 $4 - $2,226 672 $146 81,000 $62,504 190,088 $457,204 - $172
5,275
kWh
$55
6
kW-months/year
$4
-
$
$2,226
672
MMBtu
$146
81,000
Tgal
$62,504
190,088
lb
$457,204
-
$
TOTAL IMPLEMENTED Savings:
$520,010
Cost:
$665,464
$172 5,275 $55 6 $4 - - - $146 81,000 $62,469 189,300 $457,164 - $172
5,275
kWh
$55
6
kW-months/year
$4
-
$
-
-
MMBtu
$146
81,000
Tgal
$62,469
189,300
lb
$457,164
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes