IAC Assessment: MS0124
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1998
Principal Product Electric Trolling Motors
NAICS n/a
SIC 3699 - Electrical Equipment & Supplies, Nec
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 100,000
Annual Production 225,000 Pieces
Production Hrs. Annual 2,100
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,205 1,304,514 kWh $0.04
Electricity Demand $40,148 4,666 kW-months/year $8.60
Electricity Fees $1,351 - $ -
Natural Gas $18,880 3,472 MMBtu $5.44
TOTAL ENERGY COSTS $109,686
RECOMMENDED SAVINGS* $49,549 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,798
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,313
Cost:
$15,976
$2,234 67,409 $3,986 390 $93 - - - - - $2,234
67,409
kWh
$3,986
390
kW-months/year
$93
-
$
-
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,507
Cost:
$944
$2,470 74,443 - - $37 - - - - - $2,470
74,443
kWh
-
-
kW-months/year
$37
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$740
Cost:
$400
$729 21,981 - - $11 - - - - - $729
21,981
kWh
-
-
kW-months/year
$11
-
$
-
-
$
-
-
$
04: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$4,500
Cost:
$2,888
- - - - - - - - $4,500 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$4,500
-
$
05: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$35,438
Cost:
$25,290
- - - - - - $35,438 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$35,438
-
$
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$51
Cost:
$14
- - - - - - - - $51 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$51
-
$
TOTAL RECOMMENDED Savings:
$49,549
Cost:
$45,512
$5,433 163,833 $3,986 390 $141 - $35,438 - $4,551 - $5,433
163,833
kWh
$3,986
390
kW-months/year
$141
-
$
$35,438
-
$
$4,551
-
$
TOTAL IMPLEMENTED Savings:
$7,798
Cost:
$4,246
$3,199 96,424 - - $48 - - - $4,551 - $3,199
96,424
kWh
-
-
kW-months/year
$48
-
$
-
-
$
$4,551
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes