IAC Assessment: MS0127
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1999
Principal Product Vinyl Binders
NAICS n/a
SIC 2782 - Blankbooks And Looseleaf Binders
Sales $100,000,000-$500,000,000
# of Employees 550
Plant Area (Sq.Ft.) 365,000
Annual Production 80,000,000 Pieces
Production Hrs. Annual 7,584
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $420,932 11,593,494 kWh $0.04
Electricity Demand $124,587 27,686 kW-months/year $4.50
Electricity Fees $(-28,440) - $ -
Natural Gas $16,371 3,154 MMBtu $5.19
TOTAL ENERGY COSTS $419,679
RECOMMENDED SAVINGS* $303,647 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $168,589
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,685
Cost:
$1,202
$14,187 450,469 - - $(-2,502) - - - - - - - - - - - $14,187
450,469
kWh
-
-
kW-months/year
$(-2,502)
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$584
Cost:
$236
$709 22,567 - - $(-125) - - - - - - - - - - - $709
22,567
kWh
-
-
kW-months/year
$(-125)
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$140
Cost:
$54
- - - - - - $140 27 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$140
27
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$3,782
Cost:
$11,500
- - $3,726 828 $56 - - - - - - - - - - - -
-
kWh
$3,726
828
kW-months/year
$56
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$393
Cost:
$101
$360 11,430 $95 21 $(-62) - - - - - - - - - - - $360
11,430
kWh
$95
21
kW-months/year
$(-62)
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.7196 USE RE-USABLE FILTERS Savings:
$14,954
Cost:
$14,960
- - - - - - - - $47 4,710 - - - - $14,907 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$47
4,710
lb
-
-
$
-
-
$
$14,907
-
$
07: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$115,929
Cost:
$8,265
$11,198 355,510 $4,257 946 $(-1,910) - - - - - $102,384 - - - - - $11,198
355,510
kWh
$4,257
946
kW-months/year
$(-1,910)
-
$
-
-
MMBtu
-
-
lb
$102,384
-
$
-
-
$
-
-
$
08: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$156,180
Cost:
$23,010
- - - - - - - - - - - - $156,180 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$156,180
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$303,647
Cost:
$59,328
$26,454 839,976 $8,078 1,795 $(-4,543) - $140 27 $47 4,710 $102,384 - $156,180 - $14,907 - $26,454
839,976
kWh
$8,078
1,795
kW-months/year
$(-4,543)
-
$
$140
27
MMBtu
$47
4,710
lb
$102,384
-
$
$156,180
-
$
$14,907
-
$
TOTAL IMPLEMENTED Savings:
$168,589
Cost:
$24,502
$14,896 473,036 - - $(-2,627) - $140 27 - - - - $156,180 - - - $14,896
473,036
kWh
-
-
kW-months/year
$(-2,627)
-
$
$140
27
MMBtu
-
-
lb
-
-
$
$156,180
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost