IAC logo
IAC Assessment: MS0129
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0129
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1999
Principal Product Newspapers
NAICS n/a
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 44,500
Annual Production 21,500,000 Pieces
Production Hrs. Annual 5,824
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,454 2,073,271 kWh $0.04
Electricity Demand $26,274 5,543 kW-months/year $4.74
Electricity Fees $33,683 - $ -
Natural Gas $4,125 314 MMBtu $13.14
TOTAL ENERGY COSTS $144,654
RECOMMENDED SAVINGS* $38,945 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,555
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes Water Consumption One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $ $ Tgal $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,582
Cost:
-
- - - - $11,582 - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$11,582
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
Tgal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,133
Cost:
$479
$1,957 74,443 - - $1,176 - - - - - - - - - - - - - $1,957
74,443
kWh
-
-
kW-months/year
$1,176
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
Tgal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,721
Cost:
$29,711
$6,255 237,397 $1,645 347 $3,821 - - - - - - - - - - - - - $6,255
237,397
kWh
$1,645
347
kW-months/year
$3,821
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
Tgal
-
-
$
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,500
Cost:
$3,600
$937 35,463 - - $563 - - - - - - - - - - - - - $937
35,463
kWh
-
-
kW-months/year
$563
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
Tgal
-
-
$
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$623
Cost:
$1,804
- - - - - - $443 72 - - $180 600 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$443
72
MMBtu
-
-
Tgal
$180
600
gal
-
-
$
-
-
Tgal
-
-
$
06: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$3,555
Cost:
$250
- - - - - - - - $392 340,595 - - - - $497 - $2,666 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$392
340,595
Tgal
-
-
gal
-
-
$
$497
-
Tgal
$2,666
-
$
07: 4.5150 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$6,831
Cost:
$7,225
- - - - - - - - - - - - $6,831 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
$6,831
-
$
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$38,945
Cost:
$43,069
$9,149 347,303 $1,645 347 $17,142 - $443 72 $392 340,595 $180 600 $6,831 - $497 - $2,666 - $9,149
347,303
kWh
$1,645
347
kW-months/year
$17,142
-
$
$443
72
MMBtu
$392
340,595
Tgal
$180
600
gal
$6,831
-
$
$497
-
Tgal
$2,666
-
$
TOTAL IMPLEMENTED Savings:
$3,555
Cost:
$250
- - - - - - - - $392 340,595 - - - - $497 - $2,666 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$392
340,595
Tgal
-
-
gal
-
-
$
$497
-
Tgal
$2,666
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $ $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes Water Consumption One-time Revenue or Avoided Cost