IAC logo
IAC Assessment: MS0142
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0142
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1999
Principal Product Injection Molded Plastic Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 30,000
Annual Production 18,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $457,607 8,864,889 kWh $0.05
Electricity Demand $58,179 22,223 kW-months/year $2.62
Electricity Fees $(-79,673) - $ -
Natural Gas $1,349 268 MMBtu $5.03
TOTAL ENERGY COSTS $540,842
RECOMMENDED SAVINGS* $79,782 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,213
Cost:
$777
$1,508 29,601 - - $(-295) - - - $1,508
29,601
kWh
-
-
kW-months/year
$(-295)
-
$
-
-
$
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,311
Cost:
-
- - $1,292 523 $19 - - - -
-
kWh
$1,292
523
kW-months/year
$19
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$67,127
Cost:
$252,750
$76,769 1,508,206 $5,316 2,152 $(-14,958) - - - $76,769
1,508,206
kWh
$5,316
2,152
kW-months/year
$(-14,958)
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,671
Cost:
$682
$2,078 40,739 - - $(-407) - - - $2,078
40,739
kWh
-
-
kW-months/year
$(-407)
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,859
Cost:
$12,500
- - - - $6,859 - - - -
-
kWh
-
-
kW-months/year
$6,859
-
$
-
-
$
06: 3.7196 USE RE-USABLE FILTERS Savings:
$1,601
Cost:
$697
- - - - - - $1,601 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,601
-
$
TOTAL RECOMMENDED Savings:
$79,782
Cost:
$267,406
$80,355 1,578,546 $6,608 2,675 $(-8,782) - $1,601 - $80,355
1,578,546
kWh
$6,608
2,675
kW-months/year
$(-8,782)
-
$
$1,601
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost