IAC logo
IAC Assessment: MS0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1999
Principal Product Wood Household Furniture
NAICS n/a
SIC 2511 - Wood Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 235,000
Annual Production 200,000 Pieces
Production Hrs. Annual 2,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,677 3,011,430 kWh $0.03
Electricity Demand $121,273 12,933 kW-months/year $9.38
Electricity Fees $(-1,314) - $ -
Natural Gas $6,554 1,117 MMBtu $5.87
TOTAL ENERGY COSTS $235,203
RECOMMENDED SAVINGS* $10,490 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,471
Cost:
$825
$591 17,878 $1,136 107 $(-81) - - - $825 - $591
17,878
kWh
$1,136
107
kW-months/year
$(-81)
-
$
-
-
MMBtu
$825
-
$
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$405
Cost:
-
- - $424 40 $(-19) - - - - - -
-
kWh
$424
40
kW-months/year
$(-19)
-
$
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,411
Cost:
$1,101
$1,486 44,842 - - $(-75) - - - - - $1,486
44,842
kWh
-
-
kW-months/year
$(-75)
-
$
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,726
Cost:
$12,791
$4,525 136,577 $5,093 480 $(-460) - $(-3,432) (-583) - - $4,525
136,577
kWh
$5,093
480
kW-months/year
$(-460)
-
$
$(-3,432)
(-583)
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$477
Cost:
$708
$502 15,240 - - $(-25) - - - - - $502
15,240
kWh
-
-
kW-months/year
$(-25)
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,490
Cost:
$15,425
$7,104 214,537 $6,653 627 $(-660) - $(-3,432) (-583) $825 - $7,104
214,537
kWh
$6,653
627
kW-months/year
$(-660)
-
$
$(-3,432)
(-583)
MMBtu
$825
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost