IAC logo
IAC Assessment: MS0176
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0176
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2001
Principal Product Plastic Battery Components
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 150,000
Annual Production 15,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $630,882 19,315,200 kWh $0.03
Electricity Demand $366,710 37,315 kW-months/year $9.83
Electricity Fees $15,172 - $ -
Natural Gas $34,153 6,189 MMBtu $5.52
TOTAL ENERGY COSTS $1,074,117
RECOMMENDED SAVINGS* $50,417 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,170
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,770
Cost:
$20,746
$8,791 269,569 $5,761 565 $218 - - - - - - - $8,791
269,569
kWh
$5,761
565
kW-months/year
$218
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,454
Cost:
$9,024
$5,373 164,779 - - $81 - - - - - - - $5,373
164,779
kWh
-
-
kW-months/year
$81
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,687
Cost:
$6,580
$2,946 90,349 - - $45 - $1,696 343 - - - - $2,946
90,349
kWh
-
-
kW-months/year
$45
-
$
$1,696
343
MMBtu
-
-
Tgal
-
-
gal
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$633
Cost:
$888
$588 18,027 $36 4 $9 - - - - - - - $588
18,027
kWh
$36
4
kW-months/year
$9
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$292
Cost:
$591
$288 8,822 - - $4 - - - - - - - $288
8,822
kWh
-
-
kW-months/year
$4
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,504
Cost:
$18,000
- - - - $12,504 - - - - - - - -
-
kWh
-
-
kW-months/year
$12,504
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
07: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$3,044
Cost:
$3,074
- - - - - - $1,762 343 - - $1,282 3,060 -
-
kWh
-
-
kW-months/year
-
-
$
$1,762
343
MMBtu
-
-
Tgal
$1,282
3,060
gal
08: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$9,033
Cost:
$25
- - - - - - - - $9,033 7,226,600 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$9,033
7,226,600
Tgal
-
-
gal
TOTAL RECOMMENDED Savings:
$50,417
Cost:
$58,928
$17,986 551,546 $5,797 569 $12,861 - $3,458 686 $9,033 7,226,600 $1,282 3,060 $17,986
551,546
kWh
$5,797
569
kW-months/year
$12,861
-
$
$3,458
686
MMBtu
$9,033
7,226,600
Tgal
$1,282
3,060
gal
TOTAL IMPLEMENTED Savings:
$22,170
Cost:
$18,913
$588 18,027 $36 4 $12,513 - - - $9,033 7,226,600 - - $588
18,027
kWh
$36
4
kW-months/year
$12,513
-
$
-
-
MMBtu
$9,033
7,226,600
Tgal
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (haz)