IAC logo
IAC Assessment: MS0184
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0184
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2001
Principal Product Automotive Wiring Connectors
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 74
Plant Area (Sq.Ft.) 35,000
Annual Production 230,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,489 2,861,832 kWh $0.06
Electricity Demand $19,017 5,571 kW-months/year $3.41
Electricity Fees $7,368 - $ -
TOTAL ENERGY COSTS $193,834
RECOMMENDED SAVINGS* $30,661 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz)
$ kWh $ kW-months/year $ $ $ gal
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,051
Cost:
$348
$2,362 68,746 - - $689 - - - $2,362
68,746
kWh
-
-
kW-months/year
$689
-
$
-
-
gal
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$571
Cost:
$375
$441 8,466 - - $130 - - - $441
8,466
kWh
-
-
kW-months/year
$130
-
$
-
-
gal
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$14,523
Cost:
$6,599
$7,924 42,790 - - $6,599 - - - $7,924
42,790
kWh
-
-
kW-months/year
$6,599
-
$
-
-
gal
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$702
Cost:
$875
$542 10,604 - - $160 - - - $542
10,604
kWh
-
-
kW-months/year
$160
-
$
-
-
gal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,464
Cost:
$2,153
$1,127 32,804 $6 2 $331 - - - $1,127
32,804
kWh
$6
2
kW-months/year
$331
-
$
-
-
gal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$946
Cost:
$2,073
$731 14,026 - - $215 - - - $731
14,026
kWh
-
-
kW-months/year
$215
-
$
-
-
gal
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$44
Cost:
$17
$21 406 - - $6 - $17 11 $21
406
kWh
-
-
kW-months/year
$6
-
$
$17
11
gal
08: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$56
Cost:
$25
- - - - $56 - - - -
-
kWh
-
-
kW-months/year
$56
-
$
-
-
gal
09: 3.5244 RECOVER METALS FROM CASTING SAND Savings:
$9,304
Cost:
$32
- - - - - - $9,304 574 -
-
kWh
-
-
kW-months/year
-
-
$
$9,304
574
gal
TOTAL RECOMMENDED Savings:
$30,661
Cost:
$12,497
$13,148 177,842 $6 2 $8,186 - $9,321 585 $13,148
177,842
kWh
$6
2
kW-months/year
$8,186
-
$
$9,321
585
gal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ $ $ gal
Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz)