Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Mississippi State |
---|---|
Assessment Year | 2001 |
Principal Product | Wiring Harnesses |
NAICS | n/a |
SIC | 3694 - Engine Electrical Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 220 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 400,000 Pieces |
Production Hrs. Annual | 3,800 |
Location (State) | MS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $42,340 | 694,560 | kWh | $0.06 |
Electricity Demand | $58 | 1,704 | kW-months/year | $0.03 |
Electricity Fees | $6,434 | - | $ | - |
TOTAL ENERGY COSTS | $65,731 | |||
RECOMMENDED SAVINGS* | $17,545 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT |
Savings: $134 Cost: $27 |
- | - | - | - | $134 | 13 | - | - |
- - kWh |
- - $ |
$134 13 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $62 Cost: $88 |
$45 | 869 | $17 | - | - | - | - | - |
$45 869 kWh |
$17 - $ |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,408 Cost: $1,310 |
$1,032 | 19,797 | $376 | - | - | - | - | - |
$1,032 19,797 kWh |
$376 - $ |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,583 Cost: $14,235 |
$5,559 | 106,646 | $2,024 | - | - | - | - | - |
$5,559 106,646 kWh |
$2,024 - $ |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $8,358 Cost: $6,500 |
- | - | - | - | - | - | $8,358 | 202,500 |
- - kWh |
- - $ |
- - MMBtu |
$8,358 202,500 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,545 Cost: $22,160 |
$6,636 | 127,312 | $2,417 | - | $134 | 13 | $8,358 | 202,500 | $6,636 127,312 kWh |
$2,417 - $ |
$134 13 MMBtu |
$8,358 202,500 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - $ |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) |