IAC Assessment: MS0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2001
Principal Product Drinking water filtration systems
NAICS n/a
SIC 3589 - Service Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 105,000
Annual Production 400,000 Pieces
Production Hrs. Annual 6,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,981 3,610,800 kWh $0.03
Electricity Demand $86,843 9,180 kW-months/year $9.46
Electricity Fees $(-31,904) - $ -
Natural Gas $4,593 587 MMBtu $7.82
TOTAL ENERGY COSTS $189,673
RECOMMENDED SAVINGS* $66,265 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ lb
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,911
Cost:
$6,300
$3,899 111,720 $4,881 516 $131 - - - $3,899
111,720
kWh
$4,881
516
kW-months/year
$131
-
$
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$586
Cost:
$302
$578 16,560 - - $8 - - - $578
16,560
kWh
-
-
kW-months/year
$8
-
$
-
-
lb
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,338
Cost:
$9,000
- - - - $9,338 - - - -
-
kWh
-
-
kW-months/year
$9,338
-
$
-
-
lb
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$436
Cost:
$488
$430 12,313 - - $6 - - - $430
12,313
kWh
-
-
kW-months/year
$6
-
$
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,525
Cost:
$5,299
$1,246 35,709 $1,242 131 $37 - - - $1,246
35,709
kWh
$1,242
131
kW-months/year
$37
-
$
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,862
Cost:
$55,237
$9,642 276,345 $7,956 841 $264 - - - $9,642
276,345
kWh
$7,956
841
kW-months/year
$264
-
$
-
-
lb
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,869
Cost:
$96,000
$16,853 483,034 $752 80 $264 - - - $16,853
483,034
kWh
$752
80
kW-months/year
$264
-
$
-
-
lb
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$8,738
Cost:
$2,250
- - - - - - $8,738 162,000 -
-
kWh
-
-
kW-months/year
-
-
$
$8,738
162,000
lb
TOTAL RECOMMENDED Savings:
$66,265
Cost:
$174,876
$32,648 935,681 $14,831 1,568 $10,048 - $8,738 162,000 $32,648
935,681
kWh
$14,831
1,568
kW-months/year
$10,048
-
$
$8,738
162,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)