IAC logo
IAC Assessment: MS0197
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0197
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2001
Principal Product Canned vegetables
NAICS n/a
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 163
Plant Area (Sq.Ft.) 340,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 4,992
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $248,813 5,394,197 kWh $0.05
Electricity Demand $40,484 12,934 kW-months/year $3.13
Electricity Fees $36,763 - $ -
Natural Gas $641,528 109,023 MMBtu $5.88
TOTAL ENERGY COSTS $1,056,524
RECOMMENDED SAVINGS* $63,100 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$35,816
Cost:
$29,006
$22,858 665,300 $3,436 1,134 $9,522 - - - $22,858
665,300
kWh
$3,436
1,134
kW-months/year
$9,522
-
$
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$22,484
Cost:
$19,000
- - - - - - $22,484 3,877 -
-
kWh
-
-
kW-months/year
-
-
$
$22,484
3,877
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,855
Cost:
$269
- - - - - - $1,855 315 -
-
kWh
-
-
kW-months/year
-
-
$
$1,855
315
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,389
Cost:
$2,038
$891 26,084 $127 42 $371 - - - $891
26,084
kWh
$127
42
kW-months/year
$371
-
$
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,007
Cost:
$591
$712 20,809 - - $295 - - - $712
20,809
kWh
-
-
kW-months/year
$295
-
$
-
-
MMBtu
06: 2.7122 DISCONNECT BALLASTS Savings:
$285
Cost:
$340
$256 5,275 $25 8 $4 - - - $256
5,275
kWh
$25
8
kW-months/year
$4
-
$
-
-
MMBtu
07: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$264
Cost:
$122
- - - - - - $264 45 -
-
kWh
-
-
kW-months/year
-
-
$
$264
45
MMBtu
TOTAL RECOMMENDED Savings:
$63,100
Cost:
$51,366
$24,717 717,468 $3,588 1,184 $10,192 - $24,603 4,237 $24,717
717,468
kWh
$3,588
1,184
kW-months/year
$10,192
-
$
$24,603
4,237
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas