IAC Assessment: MS0200
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0200
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Drum brakes and disc brakes
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 102,000
Annual Production 1,841,154 Pieces
Production Hrs. Annual 4,160
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,911 1,349,941 kWh $0.04
Electricity Demand $31,445 3,732 kW-months/year $8.43
Electricity Fees $1,331 - $ -
Natural Gas $101,052 12,022 MMBtu $8.41
TOTAL ENERGY COSTS $278,150
RECOMMENDED SAVINGS* $30,733 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ gal
01: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$22,848
Cost:
$50,000
- - - - - - $22,848 2,709 - - -
-
kWh
-
-
kW-months/year
-
-
$
$22,848
2,709
MMBtu
-
-
gal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,783
Cost:
$6,263
$3,007 92,907 $2,691 268 $85 - - - - - $3,007
92,907
kWh
$2,691
268
kW-months/year
$85
-
$
-
-
MMBtu
-
-
gal
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,196
Cost:
$264
$306 9,379 $271 27 $9 - - - $610 - $306
9,379
kWh
$271
27
kW-months/year
$9
-
$
-
-
MMBtu
$610
-
gal
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$377
Cost:
$236
$371 11,430 - - $6 - - - - - $371
11,430
kWh
-
-
kW-months/year
$6
-
$
-
-
MMBtu
-
-
gal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$248
Cost:
$100
$244 7,620 - - $4 - - - - - $244
7,620
kWh
-
-
kW-months/year
$4
-
$
-
-
MMBtu
-
-
gal
06: 2.7122 DISCONNECT BALLASTS Savings:
$146
Cost:
$248
$76 2,345 $68 7 $2 - - - - - $76
2,345
kWh
$68
7
kW-months/year
$2
-
$
-
-
MMBtu
-
-
gal
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$135
Cost:
$236
$133 4,103 - - $2 - - - - - $133
4,103
kWh
-
-
kW-months/year
$2
-
$
-
-
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$30,733
Cost:
$57,347
$4,137 127,784 $3,030 302 $108 - $22,848 2,709 $610 - $4,137
127,784
kWh
$3,030
302
kW-months/year
$108
-
$
$22,848
2,709
MMBtu
$610
-
gal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz)