Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Linerboard
NAICS n/a
SIC 2621 - Paper Mills
Sales $100,000,000-$500,000,000
# of Employees 560
Plant Area (Sq.Ft.) 28,750,000
Annual Production 1,000,000 Tons
Production Hrs. Annual 8,760
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,429,444 214,773,450 kWh $0.02
Electricity Demand $1,843,512 217,652 kW-months/year $8.47
Electricity Fees $2,179,504 - $ -
Natural Gas $24,782,042 4,588,840 MMBtu $5.40
TOTAL ENERGY COSTS $33,535,202
RECOMMENDED SAVINGS* $113,279 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$11,647
Cost:
$9,315
$7,917 306,858 $3,559 420 $171 - $7,917
306,858
kWh
$3,559
420
kW-months/year
$171
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$75,640
Cost:
$145,111
$51,412 1,991,793 $23,111 2,729 $1,117 - $51,412
1,991,793
kWh
$23,111
2,729
kW-months/year
$1,117
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,132
Cost:
$35,712
$18,849 730,363 - - $283 - $18,849
730,363
kWh
-
-
kW-months/year
$283
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,267
Cost:
$340
$5,190 201,055 - - $77 - $5,190
201,055
kWh
-
-
kW-months/year
$77
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,593
Cost:
$1,063
$1,570 60,668 - - $23 - $1,570
60,668
kWh
-
-
kW-months/year
$23
-
$
TOTAL RECOMMENDED Savings:
$113,279
Cost:
$191,541
$84,938 3,290,737 $26,670 3,149 $1,671 - $84,938
3,290,737
kWh
$26,670
3,149
kW-months/year
$1,671
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees