IAC Assessment: MS0205
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0205
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Upholstered motion furniture
NAICS n/a
SIC 2512 - Upholstered Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 235
Plant Area (Sq.Ft.) 412,500
Annual Production 115,000 Pieces
Production Hrs. Annual 6,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,621 3,200,900 kWh $0.04
Electricity Demand $96,782 11,103 kW-months/year $8.72
Electricity Fees $6,515 - $ -
Natural Gas $34,584 3,340 MMBtu $10.35
TOTAL ENERGY COSTS $317,156
RECOMMENDED SAVINGS* $17,782 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,161
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,065
Cost:
$8,070
- - - - - - $7,065 6,821 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,065
6,821
MMBtu
-
-
lb
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,039
Cost:
$7,409
- - - - - - $5,039 4,865 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,039
4,865
MMBtu
-
-
lb
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,794
Cost:
$4,590
- - - - $2,794 - - - - - - - -
-
kWh
-
-
kW-months/year
$2,794
-
$
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,401
Cost:
$396
$827 23,303 $553 55 $21 - - - - - - - $827
23,303
kWh
$553
55
kW-months/year
$21
-
$
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$463
Cost:
$136
$458 8,479 - - $5 - - - - - - - $458
8,479
kWh
-
-
kW-months/year
$5
-
$
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7122 DISCONNECT BALLASTS Savings:
$438
Cost:
$600
$260 7,344 $171 17 $7 - - - - - - - $260
7,344
kWh
$171
17
kW-months/year
$7
-
$
-
-
MMBtu
-
-
lb
-
-
$
07: 3.1193 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING Savings:
$459
Cost:
$216
- - - - - - - - $176 69 $283 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$176
69
lb
$283
-
$
08: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$123
Cost:
$240
- - - - - - - - $123 14 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$123
14
lb
-
-
$
TOTAL RECOMMENDED Savings:
$17,782
Cost:
$21,657
$1,545 39,126 $724 72 $2,827 - $12,104 11,686 $299 83 $283 - $1,545
39,126
kWh
$724
72
kW-months/year
$2,827
-
$
$12,104
11,686
MMBtu
$299
83
lb
$283
-
$
TOTAL IMPLEMENTED Savings:
$12,161
Cost:
$13,792
$1,545 39,126 $724 72 $2,827 - $7,065 6,821 - - - - $1,545
39,126
kWh
$724
72
kW-months/year
$2,827
-
$
$7,065
6,821
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost