IAC logo
IAC Assessment: MS0207
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0207
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Hydraulic cylinders
NAICS n/a
SIC 3593 - Fluid Power Cylinders & Actuators
Sales $10,000,000-$50,000,000
# of Employees 88
Plant Area (Sq.Ft.) 94,000
Annual Production 77,000 Pieces
Production Hrs. Annual 5,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,225 2,280,400 kWh $0.04
Electricity Demand $35,878 6,644 kW-months/year $5.40
Electricity Fees $16,439 - $ -
Natural Gas $12,314 1,282 MMBtu $9.61
TOTAL ENERGY COSTS $157,465
RECOMMENDED SAVINGS* $16,339 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,888
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,269
Cost:
$291
$1,927 50,371 - - $342 - - - - - - - - - $1,927
50,371
kWh
-
-
kW-months/year
$342
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,575
Cost:
$200
- - - - - - - - - - $1,575 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$1,575
-
$
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$990
Cost:
$1,000
- - - - - - $990 104 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$990
104
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$983
Cost:
$786
$502 13,125 $481 89 - - - - - - - - - - $502
13,125
kWh
$481
89
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$491
Cost:
$437
$417 10,892 - - $74 - - - - - - - - - $417
10,892
kWh
-
-
kW-months/year
$74
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$270
Cost:
$44
$169 4,423 $70 13 $31 - - - - - - - - - $169
4,423
kWh
$70
13
kW-months/year
$31
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 3.1193 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING Savings:
$4,671
Cost:
$162
- - - - - - - - $19 4,725 - - $4,652 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$19
4,725
lb
-
-
$
$4,652
-
$
08: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$4,037
Cost:
$3,654
$3,496 78,781 $481 89 $60 - - - - - - - - - $3,496
78,781
kWh
$481
89
kW-months/year
$60
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,053
Cost:
-
- - - - - - - - $1,053 14,400 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,053
14,400
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,339
Cost:
$6,574
$6,511 157,592 $1,032 191 $507 - $990 104 $1,072 19,125 $1,575 - $4,652 - $6,511
157,592
kWh
$1,032
191
kW-months/year
$507
-
$
$990
104
MMBtu
$1,072
19,125
lb
$1,575
-
$
$4,652
-
$
TOTAL IMPLEMENTED Savings:
$3,888
Cost:
$1,244
$169 4,423 $70 13 $31 - $990 104 $1,053 14,400 $1,575 - - - $169
4,423
kWh
$70
13
kW-months/year
$31
-
$
$990
104
MMBtu
$1,053
14,400
lb
$1,575
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost