IAC logo
IAC Assessment: MS0208
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Industrial handling equipment
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $1,000,000-$5,000,000
# of Employees 62
Plant Area (Sq.Ft.) 68,000
Annual Production 4,000 Pieces
Production Hrs. Annual 4,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,364 808,560 kWh $0.04
Electricity Demand $21,196 3,533 kW-months/year $6.00
Electricity Fees $7,366 - $ -
Natural Gas $5,246 398 MMBtu $13.18
TOTAL ENERGY COSTS $73,751
RECOMMENDED SAVINGS* $5,696 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,204
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Fees Solid Waste (non-haz)
$ kWh $ $ $ lb
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,668
Cost:
$2,700
- - $2,668 - - - -
-
kWh
$2,668
-
$
-
-
lb
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$919
Cost:
$591
$906 21,216 $13 - - - $906
21,216
kWh
$13
-
$
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$244
Cost:
$129
$240 5,644 $4 - - - $240
5,644
kWh
$4
-
$
-
-
lb
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$960
Cost:
-
- - - - $960 60,000 -
-
kWh
-
-
$
$960
60,000
lb
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$905
Cost:
$374
- - - - $905 2,016 -
-
kWh
-
-
$
$905
2,016
lb
TOTAL RECOMMENDED Savings:
$5,696
Cost:
$3,794
$1,146 26,860 $2,685 - $1,865 62,016 $1,146
26,860
kWh
$2,685
-
$
$1,865
62,016
lb
TOTAL IMPLEMENTED Savings:
$1,204
Cost:
$129
$240 5,644 $4 - $960 60,000 $240
5,644
kWh
$4
-
$
$960
60,000
lb
Savings
Cost
$ kWh $ $ $ lb
Electricity Usage Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Fees Solid Waste (non-haz)