IAC logo
IAC Assessment: MS0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Electronic Audio Equipment
NAICS n/a
SIC 3651 - Household Audio And Video Equipment
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 308,350
Annual Production 370,000 Pieces
Production Hrs. Annual 6,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,851 9,170,467 kWh $0.01
Electricity Demand $157,672 26,724 kW-months/year $5.90
Electricity Fees $231,988 - $ -
Natural Gas $115,752 17,433 MMBtu $6.64
TOTAL ENERGY COSTS $684,145
RECOMMENDED SAVINGS* $47,636 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$23,960
Cost:
$13,625
$6,641 702,772 - - $17,319 - - - - - - - $6,641
702,772
kWh
-
-
kW-months/year
$17,319
-
$
-
-
MMBtu
-
-
lb
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,282
Cost:
-
- - $5,282 895 - - - - - - - - -
-
kWh
$5,282
895
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7122 DISCONNECT BALLASTS Savings:
$1,168
Cost:
$660
$216 22,832 $384 65 $568 - - - - - - - $216
22,832
kWh
$384
65
kW-months/year
$568
-
$
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,110
Cost:
$227
$308 32,548 - - $802 - - - - - - - $308
32,548
kWh
-
-
kW-months/year
$802
-
$
-
-
MMBtu
-
-
lb
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$377
Cost:
$455
- - - - - - $377 59 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$377
59
MMBtu
-
-
lb
-
-
$
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$15,739
Cost:
$22,000
- - - - - - - - $6,625 3,037,500 $9,114 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$6,625
3,037,500
lb
$9,114
-
$
TOTAL RECOMMENDED Savings:
$47,636
Cost:
$36,967
$7,165 758,152 $5,666 960 $18,689 - $377 59 $6,625 3,037,500 $9,114 - $7,165
758,152
kWh
$5,666
960
kW-months/year
$18,689
-
$
$377
59
MMBtu
$6,625
3,037,500
lb
$9,114
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $