IAC logo
IAC Assessment: MS0218
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0218
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Pharmaceuticals
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $1,000,000-$5,000,000
# of Employees 375
Plant Area (Sq.Ft.) 256,000
Annual Production 382,000 Pieces
Production Hrs. Annual 4,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $495,419 14,946,000 kWh $0.03
Electricity Demand $256,021 26,496 kW-months/year $9.66
Electricity Fees $11,272 - $ -
Natural Gas $294,384 70,799 MMBtu $4.16
TOTAL ENERGY COSTS $1,073,394
RECOMMENDED SAVINGS* $50,601 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,390
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$11,278
Cost:
$10,000
- - - - - - $11,278 2,627 -
-
kWh
-
-
kW-months/year
-
-
$
$11,278
2,627
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,569
Cost:
-
$3,811 122,379 $5,617 530 $141 - - - $3,811
122,379
kWh
$5,617
530
kW-months/year
$141
-
$
-
-
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,686
Cost:
-
- - $8,556 808 $130 - - - -
-
kWh
$8,556
808
kW-months/year
$130
-
$
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,012
Cost:
$284
$7,896 253,505 - - $116 - - - $7,896
253,505
kWh
-
-
kW-months/year
$116
-
$
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,933
Cost:
$1,200
$1,345 43,200 $5,486 518 $102 - - - $1,345
43,200
kWh
$5,486
518
kW-months/year
$102
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,718
Cost:
-
$3,661 117,623 - - $57 - - - $3,661
117,623
kWh
-
-
kW-months/year
$57
-
$
-
-
MMBtu
07: 2.7122 DISCONNECT BALLASTS Savings:
$2,405
Cost:
$1,230
$1,616 51,906 $753 71 $36 - - - $1,616
51,906
kWh
$753
71
kW-months/year
$36
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$50,601
Cost:
$12,714
$18,329 588,613 $20,412 1,927 $582 - $11,278 2,627 $18,329
588,613
kWh
$20,412
1,927
kW-months/year
$582
-
$
$11,278
2,627
MMBtu
TOTAL IMPLEMENTED Savings:
$32,390
Cost:
$1,514
$16,984 545,413 $14,926 1,409 $480 - - - $16,984
545,413
kWh
$14,926
1,409
kW-months/year
$480
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas