IAC Assessment: MS0226
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0226
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2003
Principal Product Plastic extrusion and plastic injection molded parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 132,000
Annual Production 33,840,000 Pounds
Production Hrs. Annual 84,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Demand $479,787 12,823,715 kW-months/year $0.04
Electricity Fees $(-48,219) - $ -
TOTAL ENERGY COSTS $453,692
RECOMMENDED SAVINGS* $29,818 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,276
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$18,996
Cost:
-
- - $19,927 1,567 $(-931) - -
-
kWh
$19,927
1,567
kW-months/year
$(-931)
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,859
Cost:
$2,372
$3,399 93,385 $1,698 134 $(-238) - $3,399
93,385
kWh
$1,698
134
kW-months/year
$(-238)
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,660
Cost:
$1,669
$2,791 76,663 - - $(-131) - $2,791
76,663
kWh
-
-
kW-months/year
$(-131)
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,417
Cost:
$205
$2,536 69,657 - - $(-119) - $2,536
69,657
kWh
-
-
kW-months/year
$(-119)
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$886
Cost:
$591
$930 25,538 - - $(-44) - $930
25,538
kWh
-
-
kW-months/year
$(-44)
-
$
TOTAL RECOMMENDED Savings:
$29,818
Cost:
$4,837
$9,656 265,243 $21,625 1,701 $(-1,463) - $9,656
265,243
kWh
$21,625
1,701
kW-months/year
$(-1,463)
-
$
TOTAL IMPLEMENTED Savings:
$7,276
Cost:
$2,577
$5,935 163,042 $1,698 134 $(-357) - $5,935
163,042
kWh
$1,698
134
kW-months/year
$(-357)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees