Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Mississippi State |
---|---|
Assessment Year | 2003 |
Principal Product | Rubber Industrial Tires |
NAICS | 326211 - Tire Manufacturing (except Retreading) |
SIC | 3011 - Tires And Inner Tubes |
Sales | $5,000,000-$10,000,000 |
# of Employees | 26 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 80,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $33,187 | 711,640 | kWh | $0.05 |
Electricity Demand | $21,871 | 2,768 | kW-months/year | $7.90 |
Electricity Fees | $4,720 | - | $ | - |
Natural Gas | $91,513 | 10,132 | MMBtu | $9.03 |
TOTAL ENERGY COSTS | $152,218 | |||
RECOMMENDED SAVINGS* | $15,857 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,960 Cost: $16,317 |
$3,441 | 105,561 | $2,129 | 211 | $390 | - | - | - |
$3,441 105,561 kWh |
$2,129 211 kW-months/year |
$390 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $4,125 Cost: $3,106 |
- | - | - | - | - | - | $4,125 | 469 |
- - kWh |
- - kW-months/year |
- - $ |
$4,125 469 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,323 Cost: $7,734 |
$1,592 | 48,825 | $1,514 | 150 | $217 | - | - | - |
$1,592 48,825 kWh |
$1,514 150 kW-months/year |
$217 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $987 Cost: $196 |
$922 | 28,295 | - | - | $65 | - | - | - |
$922 28,295 kWh |
- - kW-months/year |
$65 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $967 Cost: $67 |
- | - | - | - | - | - | $967 | 110 |
- - kWh |
- - kW-months/year |
- - $ |
$967 110 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $434 Cost: $472 |
$406 | 12,440 | - | - | $28 | - | - | - |
$406 12,440 kWh |
- - kW-months/year |
$28 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $61 Cost: $140 |
$37 | 1,137 | $20 | 2 | $4 | - | - | - |
$37 1,137 kWh |
$20 2 kW-months/year |
$4 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $15,857 Cost: $28,032 |
$6,398 | 196,258 | $3,663 | 363 | $704 | - | $5,092 | 579 | $6,398 196,258 kWh |
$3,663 363 kW-months/year |
$704 - $ |
$5,092 579 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |