IAC logo
IAC Assessment: MS0254
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0254
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2004
Principal Product Upholstered Furniture
NAICS 337121 - Upholstered Household Furniture Manufacturing
SIC 2512 - Upholstered Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 237,500
Annual Production 100,000 Pieces
Production Hrs. Annual 2,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,407 1,768,800 kWh $0.04
Electricity Demand $72,332 7,743 kW-months/year $9.34
Electricity Fees $2,481 - $ -
Natural Gas $55,312 4,916 MMBtu $11.25
TOTAL ENERGY COSTS $197,484
RECOMMENDED SAVINGS* $192,141 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,269
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ $
01: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$126,365
Cost:
$100,000
$1,742 24,318 $1,328 125 $45 - - - - - $123,250 - - - - - $1,742
24,318
kWh
$1,328
125
kW-months/year
$45
-
$
-
-
MMBtu
-
-
lb
$123,250
-
$
-
-
$
-
-
$
02: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$22,500
Cost:
$18,000
- - - - - - - - $22,500 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$22,500
-
lb
-
-
$
-
-
$
-
-
$
03: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$20,000
Cost:
$1,700
- - - - - - - - - - - - - - $20,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$20,000
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$11,678
Cost:
$6,900
- - - - - - $11,678 1,030 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$11,678
1,030
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,519
Cost:
$14,829
$2,878 40,186 $2,559 241 $82 - - - - - - - - - - - $2,878
40,186
kWh
$2,559
241
kW-months/year
$82
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,269
Cost:
$288
$3,220 44,966 - - $49 - - - - - - - - - - - $3,220
44,966
kWh
-
-
kW-months/year
$49
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,054
Cost:
$972
- - - - - - $1,054 93 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,054
93
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$1,075
Cost:
$330
- - - - - - - - - - - - $1,075 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$1,075
-
$
-
-
$
09: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$681
Cost:
$1,500
- - - - - - $681 60 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$681
60
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$192,141
Cost:
$144,519
$7,840 109,470 $3,887 366 $176 - $13,413 1,183 $22,500 - $123,250 - $1,075 - $20,000 - $7,840
109,470
kWh
$3,887
366
kW-months/year
$176
-
$
$13,413
1,183
MMBtu
$22,500
-
lb
$123,250
-
$
$1,075
-
$
$20,000
-
$
TOTAL IMPLEMENTED Savings:
$3,269
Cost:
$288
$3,220 44,966 - - $49 - - - - - - - - - - - $3,220
44,966
kWh
-
-
kW-months/year
$49
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ $