IAC logo
IAC Assessment: MS0264
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0264
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2004
Principal Product Recliner Mechanisms
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales <$500,000
# of Employees 350
Plant Area (Sq.Ft.) 195,000
Annual Production 1,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $173,578 4,737,893 kWh $0.04
Electricity Demand $95,587 10,855 kW-months/year $8.81
Electricity Fees $9,159 - $ -
Natural Gas $443,114 66,692 MMBtu $6.64
TOTAL ENERGY COSTS $721,438
RECOMMENDED SAVINGS* $28,193 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,208
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,471
Cost:
$84,783
$11,300 314,872 $5,912 623 $259 - - - $11,300
314,872
kWh
$5,912
623
kW-months/year
$259
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,737
Cost:
$318
$5,653 159,283 - - $84 - - - $5,653
159,283
kWh
-
-
kW-months/year
$84
-
$
-
-
MMBtu
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$2,457
Cost:
$480
$462 13,029 $1,958 207 $37 - - - $462
13,029
kWh
$1,958
207
kW-months/year
$37
-
$
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,356
Cost:
$1,624
- - - - - - $1,356 207 -
-
kWh
-
-
kW-months/year
-
-
$
$1,356
207
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$989
Cost:
$944
$974 27,452 - - $15 - - - $974
27,452
kWh
-
-
kW-months/year
$15
-
$
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$183
Cost:
$249
$117 3,293 $63 7 $3 - - - $117
3,293
kWh
$63
7
kW-months/year
$3
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$28,193
Cost:
$88,398
$18,506 517,929 $7,933 837 $398 - $1,356 207 $18,506
517,929
kWh
$7,933
837
kW-months/year
$398
-
$
$1,356
207
MMBtu
TOTAL IMPLEMENTED Savings:
$23,208
Cost:
$85,101
$16,953 474,155 $5,912 623 $343 - - - $16,953
474,155
kWh
$5,912
623
kW-months/year
$343
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas