IAC logo
IAC Assessment: MS0266
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0266
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2005
Principal Product Margarine
NAICS 311225 - Fats and Oils Refining and Blending
SIC 2079 - Edible Fats And Oils, Nec
Sales $100,000,000-$500,000,000
# of Employees 325
Plant Area (Sq.Ft.) 242,000
Annual Production 250,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $312,116 15,891,000 kWh $0.02
Electricity Demand $193,916 40,521 kW-months/year $4.79
Electricity Fees $283,791 - $ -
Natural Gas $455,159 80,520 MMBtu $5.65
TOTAL ENERGY COSTS $1,244,982
RECOMMENDED SAVINGS* $99,804 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$42,481
Cost:
$15,060
- - - - - - $42,481 7,519 - - -
-
kWh
-
-
kW-months/year
-
-
$
$42,481
7,519
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,381
Cost:
$33,730
$9,226 314,031 $3,280 604 $875 - - - - - $9,226
314,031
kWh
$3,280
604
kW-months/year
$875
-
$
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,987
Cost:
$21,549
$12,137 413,127 - - $850 - - - - - $12,137
413,127
kWh
-
-
kW-months/year
$850
-
$
-
-
MMBtu
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$10,524
Cost:
$11,556
$9,835 334,777 - - $689 - - - - - $9,835
334,777
kWh
-
-
kW-months/year
$689
-
$
-
-
MMBtu
-
-
$
05: 2.2134 ELIMINATE LEAKS IN HIGH PRESSURE REDUCING STATIONS Savings:
$10,281
Cost:
$73
- - - - - - $10,281 1,802 - - -
-
kWh
-
-
kW-months/year
-
-
$
$10,281
1,802
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,886
Cost:
$4,350
$3,590 122,195 $1,911 352 $385 - - - - - $3,590
122,195
kWh
$1,911
352
kW-months/year
$385
-
$
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,314
Cost:
$322
$2,163 73,610 - - $151 - - - - - $2,163
73,610
kWh
-
-
kW-months/year
$151
-
$
-
-
MMBtu
-
-
$
08: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,950
Cost:
$1,000
- - - - - - - - $1,950 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,950
-
$
TOTAL RECOMMENDED Savings:
$99,804
Cost:
$87,640
$36,951 1,257,740 $5,191 956 $2,950 - $52,762 9,321 $1,950 - $36,951
1,257,740
kWh
$5,191
956
kW-months/year
$2,950
-
$
$52,762
9,321
MMBtu
$1,950
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product