IAC logo
IAC Assessment: MS0268
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0268
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2005
Principal Product Vinly Flooring Tile
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3996 - Hard Surface Floor Coverings, Nec
Sales $50,000,000-$100,000,000
# of Employees 138
Plant Area (Sq.Ft.) 300,000
Annual Production 140,000 Thousand Feet
Production Hrs. Annual 8,400
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $732,252 17,941,770 kWh $0.04
Electricity Demand $119,702 32,312 kW-months/year $3.70
Electricity Fees $370,644 - $ -
Natural Gas $508,485 71,682 MMBtu $7.09
TOTAL ENERGY COSTS $1,766,512
RECOMMENDED SAVINGS* $70,877 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,099
Cost:
$44,786
$14,364 430,996 - - $8,735 - - - - - $14,364
430,996
kWh
-
-
kW-months/year
$8,735
-
$
-
-
MMBtu
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,715
Cost:
$26,992
$5,384 161,552 $868 248 $3,463 - - - - - $5,384
161,552
kWh
$868
248
kW-months/year
$3,463
-
$
-
-
MMBtu
-
-
Tgal
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$8,274
Cost:
$180
$4,642 139,275 $665 190 $2,967 - - - - - $4,642
139,275
kWh
$665
190
kW-months/year
$2,967
-
$
-
-
MMBtu
-
-
Tgal
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$8,048
Cost:
$5,265
$4,459 133,791 $721 206 $2,868 - - - - - $4,459
133,791
kWh
$721
206
kW-months/year
$2,868
-
$
-
-
MMBtu
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,966
Cost:
$509
$4,953 148,627 - - $3,013 - - - - - $4,953
148,627
kWh
-
-
kW-months/year
$3,013
-
$
-
-
MMBtu
-
-
Tgal
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$7,305
Cost:
$19
- - - - - - $7,305 1,030 - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,305
1,030
MMBtu
-
-
Tgal
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,446
Cost:
-
- - - - $4,446 - - - - - -
-
kWh
-
-
kW-months/year
$4,446
-
$
-
-
MMBtu
-
-
Tgal
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,892
Cost:
$939
- - - - - - $1,892 267 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,892
267
MMBtu
-
-
Tgal
09: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$132
Cost:
-
- - - - - - - - $132 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$132
-
Tgal
TOTAL RECOMMENDED Savings:
$70,877
Cost:
$78,690
$33,802 1,014,241 $2,254 644 $25,492 - $9,197 1,297 $132 - $33,802
1,014,241
kWh
$2,254
644
kW-months/year
$25,492
-
$
$9,197
1,297
MMBtu
$132
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal