IAC Assessment: MS0271
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0271
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2005
Principal Product Bricks
NAICS 327120 - Clay Building Material and Refractories Manufacturing
SIC 3251 - Brick And Structural Clay Tile
Sales $1,000,000-$5,000,000
# of Employees 68
Plant Area (Sq.Ft.) 118,000
Annual Production 18,000,000 Pieces
Production Hrs. Annual 8,064
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,938 1,635,091 kWh $0.04
Electricity Demand $66,959 6,313 kW-months/year $10.61
Electricity Fees $2,329 - $ -
Natural Gas $619,274 85,079 MMBtu $7.28
TOTAL ENERGY COSTS $754,500
RECOMMENDED SAVINGS* $51,476 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$46,503
Cost:
$3,038
- - - - - - $46,503 5,431 - - -
-
kWh
-
-
kW-months/year
-
-
$
$46,503
5,431
MMBtu
-
-
Tgal
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,726
Cost:
$3,000
- - - - - - $1,726 237 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,726
237
MMBtu
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,569
Cost:
$3,249
$1,030 29,397 $516 44 $23 - - - - - $1,030
29,397
kWh
$516
44
kW-months/year
$23
-
$
-
-
MMBtu
-
-
Tgal
04: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$888
Cost:
$250
- - - - - - - - $888 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$888
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$790
Cost:
$1,539
$251 7,173 $527 45 $12 - - - - - $251
7,173
kWh
$527
45
kW-months/year
$12
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$51,476
Cost:
$11,076
$1,281 36,570 $1,043 89 $35 - $48,229 5,668 $888 - $1,281
36,570
kWh
$1,043
89
kW-months/year
$35
-
$
$48,229
5,668
MMBtu
$888
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Consumption