IAC Assessment: MS0275
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0275
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2005
Principal Product Cement
NAICS 327310 - Cement Manufacturing
SIC 3241 - Cement, Hydraulic
Sales $50,000,000-$100,000,000
# of Employees 93
Plant Area (Sq.Ft.) 350,000
Annual Production 960,000 Tons
Production Hrs. Annual 8,232
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,500,000 100,000,000 kWh $0.03
Electricity Demand $1,000,000 252,213 kW-months/year $3.96
Electricity Fees $500,000 - $ -
Natural Gas $329,400 48,592 MMBtu $6.78
TOTAL ENERGY COSTS $4,374,927
RECOMMENDED SAVINGS* $43,107 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,312
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz)
$ kWh $ kW-months/year $ $ $ gal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,870
Cost:
$34,746
$6,935 462,281 $2,936 704 $4,999 - - - $6,935
462,281
kWh
$2,936
704
kW-months/year
$4,999
-
$
-
-
gal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,066
Cost:
$392
$4,121 274,713 - - $3,945 - - - $4,121
274,713
kWh
-
-
kW-months/year
$3,945
-
$
-
-
gal
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$7,356
Cost:
$3,025
$1,843 122,821 $1,639 393 $849 - $3,025 275 $1,843
122,821
kWh
$1,639
393
kW-months/year
$849
-
$
$3,025
275
gal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,972
Cost:
$15,438
$3,562 237,452 - - $3,410 - - - $3,562
237,452
kWh
-
-
kW-months/year
$3,410
-
$
-
-
gal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,020
Cost:
$9,612
$1,410 93,940 $592 142 $1,018 - - - $1,410
93,940
kWh
$592
142
kW-months/year
$1,018
-
$
-
-
gal
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,823
Cost:
$2,271
$1,269 84,576 $767 184 $787 - - - $1,269
84,576
kWh
$767
184
kW-months/year
$787
-
$
-
-
gal
TOTAL RECOMMENDED Savings:
$43,107
Cost:
$65,484
$19,140 1,275,783 $5,934 1,423 $15,008 - $3,025 275 $19,140
1,275,783
kWh
$5,934
1,423
kW-months/year
$15,008
-
$
$3,025
275
gal
TOTAL IMPLEMENTED Savings:
$33,312
Cost:
$47,775
$14,309 953,755 $5,167 1,239 $10,811 - $3,025 275 $14,309
953,755
kWh
$5,167
1,239
kW-months/year
$10,811
-
$
$3,025
275
gal
Savings
Cost
$ kWh $ kW-months/year $ $ $ gal
Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz)