IAC logo
IAC Assessment: MS0276
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0276
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2005
Principal Product Composite Structures
NAICS 336419 - Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
SIC 3769 - Space Vehicle Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 320,000
Annual Production 166 Pieces
Production Hrs. Annual 8,400
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $897,767 23,084,790 kWh $0.04
Electricity Demand $476,479 40,150 kW-months/year $11.87
Electricity Fees $21,814 - $ -
Natural Gas $175,656 19,677 MMBtu $8.93
TOTAL ENERGY COSTS $1,589,185
RECOMMENDED SAVINGS* $144,856 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,724
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$64,043
Cost:
$8,505
$63,097 1,622,437 - - $946 - $63,097
1,622,437
kWh
-
-
kW-months/year
$946
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$32,940
Cost:
$298
$32,453 834,478 - - $487 - $32,453
834,478
kWh
-
-
kW-months/year
$487
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,566
Cost:
$20,159
$14,147 363,759 $6,115 498 $304 - $14,147
363,759
kWh
$6,115
498
kW-months/year
$304
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$16,492
Cost:
$8,838
$10,304 264,964 $5,944 484 $244 - $10,304
264,964
kWh
$5,944
484
kW-months/year
$244
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,547
Cost:
$15,656
$6,450 165,855 - - $97 - $6,450
165,855
kWh
-
-
kW-months/year
$97
-
$
06: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$2,712
Cost:
$1,848
$1,530 39,347 $1,142 93 $40 - $1,530
39,347
kWh
$1,142
93
kW-months/year
$40
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,158
Cost:
$1,871
$797 20,484 $344 28 $17 - $797
20,484
kWh
$344
28
kW-months/year
$17
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$398
Cost:
$478
$97 2,507 $295 24 $6 - $97
2,507
kWh
$295
24
kW-months/year
$6
-
$
TOTAL RECOMMENDED Savings:
$144,856
Cost:
$57,653
$128,875 3,313,831 $13,840 1,127 $2,141 - $128,875
3,313,831
kWh
$13,840
1,127
kW-months/year
$2,141
-
$
TOTAL IMPLEMENTED Savings:
$21,724
Cost:
$22,030
$14,944 384,243 $6,459 526 $321 - $14,944
384,243
kWh
$6,459
526
kW-months/year
$321
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees