IAC logo
IAC Assessment: MS0283
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0283
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2005
Principal Product Electrical Equipment
NAICS 336320 - Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 203,072
Annual Production 448,794,646 Pieces
Production Hrs. Annual 8,400
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,013,802 24,701,292 kWh $0.04
Electricity Demand $167,085 45,850 kW-months/year $3.64
Electricity Fees $500,000 - $ -
Natural Gas $5,444 500 MMBtu $10.89
TOTAL ENERGY COSTS $1,686,331
RECOMMENDED SAVINGS* $101,663 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,346
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$42,251
Cost:
$69,379
$27,708 831,379 - - $14,543 - $27,708
831,379
kWh
-
-
kW-months/year
$14,543
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$32,662
Cost:
$81,973
$19,289 578,756 $2,965 847 $10,408 - $19,289
578,756
kWh
$2,965
847
kW-months/year
$10,408
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,008
Cost:
$50,375
$10,964 328,986 $1,176 336 $5,868 - $10,964
328,986
kWh
$1,176
336
kW-months/year
$5,868
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,338
Cost:
$247
$2,189 65,682 - - $1,149 - $2,189
65,682
kWh
-
-
kW-months/year
$1,149
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,965
Cost:
$3,192
$1,097 32,930 $266 76 $602 - $1,097
32,930
kWh
$266
76
kW-months/year
$602
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,320
Cost:
$236
$865 25,966 - - $455 - $865
25,966
kWh
-
-
kW-months/year
$455
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,316
Cost:
$2,025
$863 25,899 - - $453 - $863
25,899
kWh
-
-
kW-months/year
$453
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$402
Cost:
$556
$264 7,918 - - $138 - $264
7,918
kWh
-
-
kW-months/year
$138
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$401
Cost:
$1,066
$230 6,900 $46 13 $125 - $230
6,900
kWh
$46
13
kW-months/year
$125
-
$
TOTAL RECOMMENDED Savings:
$101,663
Cost:
$209,049
$63,469 1,904,416 $4,453 1,272 $33,741 - $63,469
1,904,416
kWh
$4,453
1,272
kW-months/year
$33,741
-
$
TOTAL IMPLEMENTED Savings:
$21,346
Cost:
$50,622
$13,153 394,668 $1,176 336 $7,017 - $13,153
394,668
kWh
$1,176
336
kW-months/year
$7,017
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees