IAC logo
IAC Assessment: MS0287
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0287
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2006
Principal Product Fasteners
NAICS 332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 325,000
Annual Production 48,800,000 Pieces
Production Hrs. Annual 5,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $455,669 10,178,784 kWh $0.04
Electricity Demand $55,809 14,529 kW-months/year $3.84
Electricity Fees $226,220 - $ -
Natural Gas $36,792 3,142 MMBtu $11.71
TOTAL ENERGY COSTS $774,490
RECOMMENDED SAVINGS* $82,328 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,298
Cost:
$78,252
$16,291 488,814 $3,689 1,054 $10,318 - $16,291
488,814
kWh
$3,689
1,054
kW-months/year
$10,318
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$17,250
Cost:
$41
$9,119 273,600 $2,300 657 $5,831 - $9,119
273,600
kWh
$2,300
657
kW-months/year
$5,831
-
$
03: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$9,134
Cost:
$100
$4,020 120,635 $2,247 642 $2,867 - $4,020
120,635
kWh
$2,247
642
kW-months/year
$2,867
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$8,563
Cost:
$4,617
$5,401 163,839 - - $3,162 - $5,401
163,839
kWh
-
-
kW-months/year
$3,162
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,562
Cost:
$16,090
$5,422 162,674 - - $3,140 - $5,422
162,674
kWh
-
-
kW-months/year
$3,140
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,494
Cost:
$3,825
$2,212 66,378 - - $1,282 - $2,212
66,378
kWh
-
-
kW-months/year
$1,282
-
$
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,437
Cost:
$1,550
$1,543 46,308 - - $894 - $1,543
46,308
kWh
-
-
kW-months/year
$894
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,052
Cost:
$213
$1,299 38,979 - - $753 - $1,299
38,979
kWh
-
-
kW-months/year
$753
-
$
09: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$538
Cost:
$400
$180 5,400 $203 58 $155 - $180
5,400
kWh
$203
58
kW-months/year
$155
-
$
TOTAL RECOMMENDED Savings:
$82,328
Cost:
$105,088
$45,487 1,366,627 $8,439 2,411 $28,402 - $45,487
1,366,627
kWh
$8,439
2,411
kW-months/year
$28,402
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees