IAC logo
IAC Assessment: MS0291
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0291
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2006
Principal Product recycled paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2611 - Pulp Mills
Sales $10,000,000-$50,000,000
# of Employees 88
Plant Area (Sq.Ft.) 550,000
Annual Production 96,200 Tons
Production Hrs. Annual 7,392
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,353,170 68,207,832 kWh $0.03
Electricity Demand $739,507 129,284 kW-months/year $5.72
Electricity Fees $13,575,693 - $ -
Natural Gas $1,546,515 222,197 MMBtu $6.96
TOTAL ENERGY COSTS $18,214,885
RECOMMENDED SAVINGS* $389,750 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,515
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$224,456
Cost:
$74,722
$21,383 619,793 $5,647 1,006 $197,426 - - - $21,383
619,793
kWh
$5,647
1,006
kW-months/year
$197,426
-
$
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$42,324
Cost:
$29,520
- - - - - - $42,324 6,081 -
-
kWh
-
-
kW-months/year
-
-
$
$42,324
6,081
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$38,212
Cost:
$8,550
$3,590 104,052 $1,387 245 $33,235 - - - $3,590
104,052
kWh
$1,387
245
kW-months/year
$33,235
-
$
-
-
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$28,523
Cost:
$2,000
- - - - - - $28,523 4,098 -
-
kWh
-
-
kW-months/year
-
-
$
$28,523
4,098
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,397
Cost:
$233
$1,808 52,397 - - $16,589 - - - $1,808
52,397
kWh
-
-
kW-months/year
$16,589
-
$
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,825
Cost:
$34,509
$1,029 29,823 $292 52 $9,504 - - - $1,029
29,823
kWh
$292
52
kW-months/year
$9,504
-
$
-
-
MMBtu
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$10,794
Cost:
$1,853
- - - - - - $10,794 1,551 -
-
kWh
-
-
kW-months/year
-
-
$
$10,794
1,551
MMBtu
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$9,158
Cost:
$169
- - - - - - $9,158 1,315 -
-
kWh
-
-
kW-months/year
-
-
$
$9,158
1,315
MMBtu
09: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$6,088
Cost:
$600
$428 12,312 $1,454 259 $4,206 - - - $428
12,312
kWh
$1,454
259
kW-months/year
$4,206
-
$
-
-
MMBtu
10: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$973
Cost:
-
$96 2,774 - - $877 - - - $96
2,774
kWh
-
-
kW-months/year
$877
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$389,750
Cost:
$152,156
$28,334 821,151 $8,780 1,562 $261,837 - $90,799 13,045 $28,334
821,151
kWh
$8,780
1,562
kW-months/year
$261,837
-
$
$90,799
13,045
MMBtu
TOTAL IMPLEMENTED Savings:
$71,515
Cost:
$31,606
$1,808 52,397 - - $16,589 - $53,118 7,632 $1,808
52,397
kWh
-
-
kW-months/year
$16,589
-
$
$53,118
7,632
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas