IAC logo
IAC Assessment: MS0292
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0292
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2006
Principal Product Toilet Seats
NAICS 314999 - All Other Miscellaneous Textile Product Mills
SIC 2399 - Fabricated Textile Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 300,000
Annual Production 7,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,070,809 25,368,440 kWh $0.04
Electricity Demand $297,108 60,120 kW-months/year $4.94
Electricity Fees $69,672 - $ -
Natural Gas $623,234 67,810 MMBtu $9.19
TOTAL ENERGY COSTS $2,060,823
RECOMMENDED SAVINGS* $31,248 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,295
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,743
Cost:
$34,278
$11,733 274,788 $2,791 564 $219 - $11,733
274,788
kWh
$2,791
564
kW-months/year
$219
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,311
Cost:
$46,268
$6,609 154,783 $1,579 319 $123 - $6,609
154,783
kWh
$1,579
319
kW-months/year
$123
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,836
Cost:
$21,282
$4,765 111,583 - - $71 - $4,765
111,583
kWh
-
-
kW-months/year
$71
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,405
Cost:
$231
$2,370 55,501 - - $35 - $2,370
55,501
kWh
-
-
kW-months/year
$35
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$953
Cost:
$753
$761 17,830 $178 36 $14 - $761
17,830
kWh
$178
36
kW-months/year
$14
-
$
TOTAL RECOMMENDED Savings:
$31,248
Cost:
$102,812
$26,238 614,485 $4,548 919 $462 - $26,238
614,485
kWh
$4,548
919
kW-months/year
$462
-
$
TOTAL IMPLEMENTED Savings:
$30,295
Cost:
$102,059
$25,477 596,655 $4,370 883 $448 - $25,477
596,655
kWh
$4,370
883
kW-months/year
$448
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees