IAC logo
IAC Assessment: MS0293
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0293
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2006
Principal Product Meat
NAICS 311611 - Animal (except Poultry) Slaughtering
SIC 2011 - Meat Packing Plants
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 35,650
Annual Production 15,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,842 2,129,300 kWh $0.03
Electricity Fees $72,274 - $ -
Natural Gas $144,639 13,312 MMBtu $10.87
TOTAL ENERGY COSTS $276,755
RECOMMENDED SAVINGS* $10,497 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,933
Cost:
$670
- - - - $3,933 191 -
-
kWh
-
-
$
$3,933
191
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,385
Cost:
$176
$361 61,364 $2,024 - - - $361
61,364
kWh
$2,024
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,307
Cost:
$2,895
$195 33,627 $1,112 - - - $195
33,627
kWh
$1,112
-
$
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,168
Cost:
$7,343
$174 30,054 $994 - - - $174
30,054
kWh
$994
-
$
-
-
MMBtu
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$564
Cost:
$3,595
- - - - $564 33 -
-
kWh
-
-
$
$564
33
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$421
Cost:
$55
- - - - $421 20 -
-
kWh
-
-
$
$421
20
MMBtu
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$351
Cost:
$210
$52 9,039 $299 - - - $52
9,039
kWh
$299
-
$
-
-
MMBtu
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$235
Cost:
$62
- - - - $235 13 -
-
kWh
-
-
$
$235
13
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$133
Cost:
$233
$20 3,422 $113 - - - $20
3,422
kWh
$113
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$10,497
Cost:
$15,239
$802 137,506 $4,542 - $5,153 257 $802
137,506
kWh
$4,542
-
$
$5,153
257
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas