IAC logo
IAC Assessment: MS0295
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0295
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2006
Principal Product vinyl
NAICS 313310 - Textile and Fabric Finishing Mills
SIC 2295 - Coated Fabrics, Not Rubberized
Sales $100,000,000-$500,000,000
# of Employees 375
Plant Area (Sq.Ft.) 700,000
Annual Production 300,000,000 Units
Production Hrs. Annual 7,488
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,140,801 36,017,600 kWh $0.03
Electricity Demand $704,150 72,701 kW-months/year $9.69
Electricity Fees $30,374 - $ -
Natural Gas $1,572,843 171,573 MMBtu $9.17
TOTAL ENERGY COSTS $3,448,168
RECOMMENDED SAVINGS* $59,124 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $58,110
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,158
Cost:
$36,274
$19,314 505,597 $8,537 810 $(-3,693) - - - $19,314
505,597
kWh
$8,537
810
kW-months/year
$(-3,693)
-
$
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,061
Cost:
$87,943
$16,124 422,088 $8,169 775 $(-3,232) - - - $16,124
422,088
kWh
$8,169
775
kW-months/year
$(-3,232)
-
$
-
-
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$6,813
Cost:
$37
- - - - - - $6,813 743 -
-
kWh
-
-
kW-months/year
-
-
$
$6,813
743
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,542
Cost:
$3,825
$2,581 67,555 $1,507 143 $(-546) - - - $2,581
67,555
kWh
$1,507
143
kW-months/year
$(-546)
-
$
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,141
Cost:
$223
$2,457 64,315 - - $(-316) - - - $2,457
64,315
kWh
-
-
kW-months/year
$(-316)
-
$
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,014
Cost:
$410
$717 18,769 $453 43 $(-156) - - - $717
18,769
kWh
$453
43
kW-months/year
$(-156)
-
$
-
-
MMBtu
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$395
Cost:
$48
- - - - - - $395 43 -
-
kWh
-
-
kW-months/year
-
-
$
$395
43
MMBtu
TOTAL RECOMMENDED Savings:
$59,124
Cost:
$128,760
$41,193 1,078,324 $18,666 1,771 $(-7,943) - $7,208 786 $41,193
1,078,324
kWh
$18,666
1,771
kW-months/year
$(-7,943)
-
$
$7,208
786
MMBtu
TOTAL IMPLEMENTED Savings:
$58,110
Cost:
$128,350
$40,476 1,059,555 $18,213 1,728 $(-7,787) - $7,208 786 $40,476
1,059,555
kWh
$18,213
1,728
kW-months/year
$(-7,787)
-
$
$7,208
786
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas