Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2006
Principal Product PVC resin and compound
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $100,000,000-$500,000,000
# of Employees 174
Plant Area (Sq.Ft.) 1,089,000
Annual Production 1,220,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,015,166 114,369,401 kWh $0.03
Electricity Demand $1,656,077 173,593 kW-months/year $9.54
Electricity Fees $239,433 - $ -
Natural Gas $11,802,202 1,263,236 MMBtu $9.34
TOTAL ENERGY COSTS $16,712,878
RECOMMENDED SAVINGS* $154,955 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $95,001
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$57,344
Cost:
$3,269
$56,496 2,140,000 - - $848 - - - $56,496
2,140,000
kWh
-
-
kW-months/year
$848
-
$
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$44,954
Cost:
$113,910
$44,289 1,677,626 - - $665 - - - $44,289
1,677,626
kWh
-
-
kW-months/year
$665
-
$
-
-
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$33,575
Cost:
$374
- - - - - - $33,575 3,596 -
-
kWh
-
-
kW-months/year
-
-
$
$33,575
3,596
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,105
Cost:
$51,885
$7,967 301,785 $3,959 415 $179 - - - $7,967
301,785
kWh
$3,959
415
kW-months/year
$179
-
$
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,082
Cost:
$6,420
$2,352 89,100 $1,670 175 $60 - - - $2,352
89,100
kWh
$1,670
175
kW-months/year
$60
-
$
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,895
Cost:
$12,886
$1,631 61,799 $1,221 128 $43 - - - $1,631
61,799
kWh
$1,221
128
kW-months/year
$43
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$154,955
Cost:
$188,744
$112,735 4,270,310 $6,850 718 $1,795 - $33,575 3,596 $112,735
4,270,310
kWh
$6,850
718
kW-months/year
$1,795
-
$
$33,575
3,596
MMBtu
TOTAL IMPLEMENTED Savings:
$95,001
Cost:
$10,063
$58,848 2,229,100 $1,670 175 $908 - $33,575 3,596 $58,848
2,229,100
kWh
$1,670
175
kW-months/year
$908
-
$
$33,575
3,596
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas