IAC logo
IAC Assessment: MS0298
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0298
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2006
Principal Product Steer Axles
NAICS 333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537 - Industrial Trucks And Tractors
Sales $100,000,000-$500,000,000
# of Employees 548
Plant Area (Sq.Ft.) 300,000
Annual Production 168,066 Pieces
Production Hrs. Annual 6,000
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,098,076 30,193,200 kWh $0.04
Electricity Demand $202,364 49,499 kW-months/year $4.09
Electricity Fees $44,547 - $ -
Natural Gas $1,027,346 77,429 MMBtu $13.27
TOTAL ENERGY COSTS $2,372,333
RECOMMENDED SAVINGS* $48,386 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,532
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$33,600
Cost:
$53,730
$28,762 782,506 $4,500 1,200 $338 - - - $28,762
782,506
kWh
$4,500
1,200
kW-months/year
$338
-
$
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,377
Cost:
$17,617
$5,323 144,815 - - $54 - - - $5,323
144,815
kWh
-
-
kW-months/year
$54
-
$
-
-
MMBtu
03: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$3,854
Cost:
$1,700
- - - - - - $3,854 291 -
-
kWh
-
-
kW-months/year
-
-
$
$3,854
291
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,964
Cost:
$236
$1,945 52,910 - - $19 - - - $1,945
52,910
kWh
-
-
kW-months/year
$19
-
$
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,852
Cost:
$2,775
$1,612 43,866 $221 59 $19 - - - $1,612
43,866
kWh
$221
59
kW-months/year
$19
-
$
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,739
Cost:
$1,313
$1,407 38,267 $315 84 $17 - - - $1,407
38,267
kWh
$315
84
kW-months/year
$17
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$48,386
Cost:
$77,371
$39,049 1,062,364 $5,036 1,343 $447 - $3,854 291 $39,049
1,062,364
kWh
$5,036
1,343
kW-months/year
$447
-
$
$3,854
291
MMBtu
TOTAL IMPLEMENTED Savings:
$44,532
Cost:
$75,671
$39,049 1,062,364 $5,036 1,343 $447 - - - $39,049
1,062,364
kWh
$5,036
1,343
kW-months/year
$447
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas