IAC logo
IAC Assessment: MS0301
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0301
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2006
Principal Product Aircraft parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 340
Plant Area (Sq.Ft.) 400,000
Annual Production 223,000 Pieces
Production Hrs. Annual 4,992
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $275,694 11,755,748 kWh $0.02
Electricity Demand $78,216 24,970 kW-months/year $3.13
Electricity Fees $33,818 - $ -
Natural Gas $1,032,380 117,572 MMBtu $8.78
TOTAL ENERGY COSTS $1,420,108
RECOMMENDED SAVINGS* $38,586 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,519
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$17,310
Cost:
$21,720
- - - - - - $17,310 1,982 -
-
kWh
-
-
kW-months/year
-
-
$
$17,310
1,982
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,625
Cost:
$30,484
$6,821 495,707 $4,815 681 $989 - - - $6,821
495,707
kWh
$4,815
681
kW-months/year
$989
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,037
Cost:
$21,914
$1,441 104,744 $1,357 192 $239 - - - $1,441
104,744
kWh
$1,357
192
kW-months/year
$239
-
$
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,153
Cost:
$9,150
$1,029 74,785 $1,124 159 - - - - $1,029
74,785
kWh
$1,124
159
kW-months/year
-
-
$
-
-
MMBtu
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,477
Cost:
$2,186
- - - - - - $1,477 123 -
-
kWh
-
-
kW-months/year
-
-
$
$1,477
123
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,070
Cost:
$244
$986 71,683 - - $84 - - - $986
71,683
kWh
-
-
kW-months/year
$84
-
$
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$914
Cost:
$4,882
$842 61,221 - - $72 - - - $842
61,221
kWh
-
-
kW-months/year
$72
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$38,586
Cost:
$90,580
$11,119 808,140 $7,296 1,032 $1,384 - $18,787 2,105 $11,119
808,140
kWh
$7,296
1,032
kW-months/year
$1,384
-
$
$18,787
2,105
MMBtu
TOTAL IMPLEMENTED Savings:
$35,519
Cost:
$76,548
$9,248 672,134 $6,172 873 $1,312 - $18,787 2,105 $9,248
672,134
kWh
$6,172
873
kW-months/year
$1,312
-
$
$18,787
2,105
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas