IAC Assessment: MS0304
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0304
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2006
Principal Product Hydraulic Components
NAICS 332912 - Fluid Power Valve and Hose Fitting Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $100,000,000-$500,000,000
# of Employees 550
Plant Area (Sq.Ft.) 270,000
Annual Production 18,000 Pieces
Production Hrs. Annual 4,160
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $730,653 17,247,384 kWh $0.04
Electricity Demand $138,133 37,578 kW-months/year $3.68
Electricity Fees $717,475 - $ -
Natural Gas $52,574 3,836 MMBtu $13.71
TOTAL ENERGY COSTS $1,638,835
RECOMMENDED SAVINGS* $431,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $431,910
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$289,291
Cost:
$222,009
$62,777 831,773 $4,465 1,413 $222,049 - $62,777
831,773
kWh
$4,465
1,413
kW-months/year
$222,049
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$118,243
Cost:
$1,820
$26,061 345,309 - - $92,182 - $26,061
345,309
kWh
-
-
kW-months/year
$92,182
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,366
Cost:
$16,063
$3,828 50,714 - - $13,538 - $3,828
50,714
kWh
-
-
kW-months/year
$13,538
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$7,010
Cost:
$153
$1,484 19,668 $275 87 $5,251 - $1,484
19,668
kWh
$275
87
kW-months/year
$5,251
-
$
TOTAL RECOMMENDED Savings:
$431,910
Cost:
$240,045
$94,150 1,247,464 $4,740 1,500 $333,020 - $94,150
1,247,464
kWh
$4,740
1,500
kW-months/year
$333,020
-
$
TOTAL IMPLEMENTED Savings:
$431,910
Cost:
$240,045
$94,150 1,247,464 $4,740 1,500 $333,020 - $94,150
1,247,464
kWh
$4,740
1,500
kW-months/year
$333,020
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees