IAC Assessment: MS0309
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0309
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2007
Principal Product Lumber
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 66
Plant Area (Sq.Ft.) 45,000
Annual Production 13,000 Thousand Feet
Production Hrs. Annual 4,500
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $238,420 309,150 kWh $0.77
Electricity Demand $36,248 9,062 kW-months/year $4.00
Electricity Fees $4,608 - $ -
Natural Gas $31,972 50,500 MMBtu $0.63
TOTAL ENERGY COSTS $311,248
RECOMMENDED SAVINGS* $411,422 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,457
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees By-product Production Electricity Usage Electricity Demand Electricity Fees By-product Production
$ kWh $ kW-months/year $ $ $ $
01: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$399,965
Cost:
$2,750,000
$238,420 11,137,500 $36,248 9,062 $4,607 - $120,690 - $238,420
11,137,500
kWh
$36,248
9,062
kW-months/year
$4,607
-
$
$120,690
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,357
Cost:
$7,875
$4,477 56,026 $800 200 $80 - - - $4,477
56,026
kWh
$800
200
kW-months/year
$80
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,962
Cost:
$156
$2,918 36,509 - - $44 - - - $2,918
36,509
kWh
-
-
kW-months/year
$44
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,297
Cost:
$2,981
$1,995 24,964 $268 67 $34 - - - $1,995
24,964
kWh
$268
67
kW-months/year
$34
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$841
Cost:
$3,593
$705 8,817 $124 31 $12 - - - $705
8,817
kWh
$124
31
kW-months/year
$12
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$411,422
Cost:
$2,764,605
$248,515 11,263,816 $37,440 9,360 $4,777 - $120,690 - $248,515
11,263,816
kWh
$37,440
9,360
kW-months/year
$4,777
-
$
$120,690
-
$
TOTAL IMPLEMENTED Savings:
$11,457
Cost:
$14,605
$10,095 126,316 $1,192 298 $170 - - - $10,095
126,316
kWh
$1,192
298
kW-months/year
$170
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees By-product Production Electricity Usage Electricity Demand Electricity Fees By-product Production