DOE MESC
IAC logo
IAC Assessment: MS0322
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2007
Principal Product Tires
NAICS 326211 - Tire Manufacturing (except Retreading)
SIC 3011 - Tires And Inner Tubes
Sales $50,000,000-$100,000,000
# of Employees 1,750
Plant Area (Sq.Ft.) 1,700,000
Annual Production 14,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,563,617 126,518,370 kWh $0.03
Electricity Demand $2,057,874 203,013 kW-months/year $10.14
Electricity Fees $14,101 - $ -
Natural Gas $4,776,784 589,976 MMBtu $8.10
TOTAL ENERGY COSTS $10,412,376
RECOMMENDED SAVINGS* $777,721 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,956
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$573,726
Cost:
$6,271,690
$2,537,312 91,566,674 $1,254,340 125,434 $57 - $(-3,217,983) (-390,532) $2,537,312
91,566,674
kWh
$1,254,340
125,434
kW-months/year
$57
-
$
$(-3,217,983)
(-390,532)
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$180,588
Cost:
$443,666
$120,848 4,361,153 $59,740 5,974 - - - - $120,848
4,361,153
kWh
$59,740
5,974
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,977
Cost:
$662
$9,977 441,103 - - - - - - $9,977
441,103
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,530
Cost:
$4,972
$9,530 343,918 - - - - - - $9,530
343,918
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,921
Cost:
$17,102
$1,351 48,759 $1,570 157 - - - - $1,351
48,759
kWh
$1,570
157
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$979
Cost:
$480
$599 21,625 $380 38 - - - - $599
21,625
kWh
$380
38
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$777,721
Cost:
$6,738,572
$2,679,617 96,783,232 $1,316,030 131,603 $57 - $(-3,217,983) (-390,532) $2,679,617
96,783,232
kWh
$1,316,030
131,603
kW-months/year
$57
-
$
$(-3,217,983)
(-390,532)
MMBtu
TOTAL IMPLEMENTED Savings:
$10,956
Cost:
$1,142
$10,576 462,728 $380 38 - - - - $10,576
462,728
kWh
$380
38
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas