IAC logo
IAC Assessment: MS0325
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0325
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2008
Principal Product Meat
NAICS 311611 - Animal (except Poultry) Slaughtering
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 53,000
Annual Production 7,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $282,140 3,897,120 kWh $0.07
Electricity Demand $53,335 9,877 kW-months/year $5.40
Electricity Fees $340,507 - $ -
Natural Gas $240,114 23,378 MMBtu $10.27
TOTAL ENERGY COSTS $916,096
RECOMMENDED SAVINGS* $42,203 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,408
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,471
Cost:
$24,719
$17,385 242,981 $1,798 333 $288 - - - $17,385
242,981
kWh
$1,798
333
kW-months/year
$288
-
$
-
-
MMBtu
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$9,208
Cost:
$156
- - - - - - $9,208 900 -
-
kWh
-
-
kW-months/year
-
-
$
$9,208
900
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,992
Cost:
$8,100
- - - - - - $6,992 681 -
-
kWh
-
-
kW-months/year
-
-
$
$6,992
681
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,031
Cost:
$7,308
$3,971 55,500 - - $60 - - - $3,971
55,500
kWh
-
-
kW-months/year
$60
-
$
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,772
Cost:
$236
$1,747 24,433 - - $25 - - - $1,747
24,433
kWh
-
-
kW-months/year
$25
-
$
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$411
Cost:
$1,800
$403 5,615 - - $8 - - - $403
5,615
kWh
-
-
kW-months/year
$8
-
$
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$318
Cost:
$1,050
$216 3,020 $97 18 $5 - - - $216
3,020
kWh
$97
18
kW-months/year
$5
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$42,203
Cost:
$43,369
$23,722 331,549 $1,895 351 $386 - $16,200 1,581 $23,722
331,549
kWh
$1,895
351
kW-months/year
$386
-
$
$16,200
1,581
MMBtu
TOTAL IMPLEMENTED Savings:
$29,408
Cost:
$27,725
$18,004 251,616 $1,895 351 $301 - $9,208 900 $18,004
251,616
kWh
$1,895
351
kW-months/year
$301
-
$
$9,208
900
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas