IAC logo
IAC Assessment: MS0334
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0334
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2008
Principal Product Broadwoven fabric
NAICS 313210 - Broadwoven Fabric Mills
SIC 2221 - Broadwoven Fabric Mills, Manmade
Sales $10,000,000-$50,000,000
# of Employees 235
Plant Area (Sq.Ft.) 330,000
Annual Production 470,000 Units
Production Hrs. Annual 8,736
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $748,222 15,682,800 kWh $0.05
Electricity Demand $365,673 30,478 kW-months/year $12.00
Natural Gas $350,701 36,932 MMBtu $9.50
TOTAL ENERGY COSTS $1,464,596
RECOMMENDED SAVINGS* $92,509 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,339
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$43,579
Cost:
$39,390
$32,533 769,100 $11,046 1,056 - - $32,533
769,100
kWh
$11,046
1,056
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,097
Cost:
$53,432
$12,669 299,501 $5,428 514 - - $12,669
299,501
kWh
$5,428
514
kW-months/year
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,689
Cost:
$11,700
- - - - $17,689 1,835 -
-
kWh
-
-
kW-months/year
$17,689
1,835
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,339
Cost:
$391
$7,339 173,496 - - - - $7,339
173,496
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,805
Cost:
$2,170
$3,138 74,195 $2,667 225 - - $3,138
74,195
kWh
$2,667
225
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$92,509
Cost:
$107,083
$55,679 1,316,292 $19,141 1,795 $17,689 1,835 $55,679
1,316,292
kWh
$19,141
1,795
kW-months/year
$17,689
1,835
MMBtu
TOTAL IMPLEMENTED Savings:
$7,339
Cost:
$391
$7,339 173,496 - - - - $7,339
173,496
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas