IAC logo
IAC Assessment: MS0337
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0337
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2009
Principal Product Steel Tubing
NAICS 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317 - Steel Pipe And Tubes
Sales $100,000,000-$500,000,000
# of Employees 140
Plant Area (Sq.Ft.) 30,700
Annual Production 600,000,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $622,464 11,381,400 kWh $0.05
Electricity Demand $311,122 23,816 kW-months/year $13.06
Electricity Fees $14,658 - $ -
Natural Gas $1,712,065 157,798 MMBtu $10.85
TOTAL ENERGY COSTS $2,660,309
RECOMMENDED SAVINGS* $372,917 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $284,008
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2514 COVER OPEN TANKS Savings:
$284,008
Cost:
$8,869
- - - - - - $284,008 25,837 -
-
kWh
-
-
kW-months/year
-
-
$
$284,008
25,837
MMBtu
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$43,299
Cost:
$6,450
- - - - - - $43,299 39,390 -
-
kWh
-
-
kW-months/year
-
-
$
$43,299
39,390
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$38,691
Cost:
$2,000
- - - - - - $38,691 3,520 -
-
kWh
-
-
kW-months/year
-
-
$
$38,691
3,520
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,045
Cost:
$5,142
$3,985 56,849 - - $60 - - - $3,985
56,849
kWh
-
-
kW-months/year
$60
-
$
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,874
Cost:
$4,735
$1,935 29,709 $897 59 $42 - - - $1,935
29,709
kWh
$897
59
kW-months/year
$42
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$372,917
Cost:
$27,196
$5,920 86,558 $897 59 $102 - $365,998 68,747 $5,920
86,558
kWh
$897
59
kW-months/year
$102
-
$
$365,998
68,747
MMBtu
TOTAL IMPLEMENTED Savings:
$284,008
Cost:
$8,869
- - - - - - $284,008 25,837 -
-
kWh
-
-
kW-months/year
-
-
$
$284,008
25,837
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas