Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Mississippi State |
---|---|
Assessment Year | 2009 |
Principal Product | Steel Tubing |
NAICS | 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3317 - Steel Pipe And Tubes |
Sales | $100,000,000-$500,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 30,700 |
Annual Production | 600,000,000 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | MS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $622,464 | 11,381,400 | kWh | $0.05 |
Electricity Demand | $311,122 | 23,816 | kW-months/year | $13.06 |
Electricity Fees | $14,658 | - | $ | - |
Natural Gas | $1,712,065 | 157,798 | MMBtu | $10.85 |
TOTAL ENERGY COSTS | $2,660,309 | |||
RECOMMENDED SAVINGS* | $372,917 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $284,008 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2514 COVER OPEN TANKS |
Savings: $284,008 Cost: $8,869 |
- | - | - | - | - | - | $284,008 | 25,837 |
- - kWh |
- - kW-months/year |
- - $ |
$284,008 25,837 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $43,299 Cost: $6,450 |
- | - | - | - | - | - | $43,299 | 39,390 |
- - kWh |
- - kW-months/year |
- - $ |
$43,299 39,390 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $38,691 Cost: $2,000 |
- | - | - | - | - | - | $38,691 | 3,520 |
- - kWh |
- - kW-months/year |
- - $ |
$38,691 3,520 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,045 Cost: $5,142 |
$3,985 | 56,849 | - | - | $60 | - | - | - |
$3,985 56,849 kWh |
- - kW-months/year |
$60 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,874 Cost: $4,735 |
$1,935 | 29,709 | $897 | 59 | $42 | - | - | - |
$1,935 29,709 kWh |
$897 59 kW-months/year |
$42 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $372,917 Cost: $27,196 |
$5,920 | 86,558 | $897 | 59 | $102 | - | $365,998 | 68,747 | $5,920 86,558 kWh |
$897 59 kW-months/year |
$102 - $ |
$365,998 68,747 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $284,008 Cost: $8,869 |
- | - | - | - | - | - | $284,008 | 25,837 | - - kWh |
- - kW-months/year |
- - $ |
$284,008 25,837 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |