IAC logo
IAC Assessment: MS0345
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0345
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2009
Principal Product LUMBER
NAICS 321114 - Wood Preservation
SIC 2491 - Wood Preserving
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 367,000
Annual Production 260,000 Thousand Feet
Production Hrs. Annual 2,205
Location (State) Al
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $356,948 5,871,600 kWh $0.06
Electricity Demand $107,550 26,647 kW-months/year $4.04
Electricity Fees $39,382 - $ -
TOTAL ENERGY COSTS $503,880
RECOMMENDED SAVINGS* $50,688 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,599
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,308
Cost:
$7,084
$17,984 295,835 - - $324 - - - $17,984
295,835
kWh
-
-
kW-months/year
$324
-
$
-
-
MMBtu
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$13,965
Cost:
$187
- - - - - - $13,965 4,074 -
-
kWh
-
-
kW-months/year
-
-
$
$13,965
4,074
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,762
Cost:
$10,935
$4,150 68,272 $1,510 372 $102 - - - $4,150
68,272
kWh
$1,510
372
kW-months/year
$102
-
$
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,977
Cost:
$4,445
$3,695 60,786 $1,194 294 $88 - - - $3,695
60,786
kWh
$1,194
294
kW-months/year
$88
-
$
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,379
Cost:
$462
$3,319 54,591 - - $60 - - - $3,319
54,591
kWh
-
-
kW-months/year
$60
-
$
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,924
Cost:
$12,190
$1,387 22,821 $503 124 $34 - - - $1,387
22,821
kWh
$503
124
kW-months/year
$34
-
$
-
-
MMBtu
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,095
Cost:
$630
$1,076 17,698 - - $19 - - - $1,076
17,698
kWh
-
-
kW-months/year
$19
-
$
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$948
Cost:
$864
$931 15,321 - - $17 - - - $931
15,321
kWh
-
-
kW-months/year
$17
-
$
-
-
MMBtu
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$330
Cost:
$168
- - - - - - $330 97 -
-
kWh
-
-
kW-months/year
-
-
$
$330
97
MMBtu
TOTAL RECOMMENDED Savings:
$50,688
Cost:
$36,965
$32,542 535,324 $3,207 790 $644 - $14,295 4,171 $32,542
535,324
kWh
$3,207
790
kW-months/year
$644
-
$
$14,295
4,171
MMBtu
TOTAL IMPLEMENTED Savings:
$23,599
Cost:
$6,126
$7,945 130,698 $1,194 294 $165 - $14,295 4,171 $7,945
130,698
kWh
$1,194
294
kW-months/year
$165
-
$
$14,295
4,171
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood