IAC logo
IAC Assessment: MS0357
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0357
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2010
Principal Product steel
NAICS 331110 - Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 336,119
Annual Production 28,500 Tons
Production Hrs. Annual 4,992
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,174 1,794,800 kWh $0.06
Electricity Demand $34,904 10,508 kW-months/year $3.32
Electricity Fees $20,771 - $ -
Natural Gas $19,138 2,119 MMBtu $9.03
TOTAL ENERGY COSTS $178,987
RECOMMENDED SAVINGS* $68,887 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,030
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$36,948
Cost:
$14,221
$21,442 443,883 $6,485 2,134 $9,021 - $21,442
443,883
kWh
$6,485
2,134
kW-months/year
$9,021
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,909
Cost:
$70,983
$15,607 323,085 $4,732 1,557 $6,570 - $15,607
323,085
kWh
$4,732
1,557
kW-months/year
$6,570
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,970
Cost:
$284
$2,970 61,478 - - - - $2,970
61,478
kWh
-
-
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,060
Cost:
$13,841
$1,195 24,741 $362 94 $503 - $1,195
24,741
kWh
$362
94
kW-months/year
$503
-
$
TOTAL RECOMMENDED Savings:
$68,887
Cost:
$99,329
$41,214 853,187 $11,579 3,785 $16,094 - $41,214
853,187
kWh
$11,579
3,785
kW-months/year
$16,094
-
$
TOTAL IMPLEMENTED Savings:
$5,030
Cost:
$14,125
$4,165 86,219 $362 94 $503 - $4,165
86,219
kWh
$362
94
kW-months/year
$503
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees