IAC logo
IAC Assessment: MS0360
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0360
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2010
Principal Product PET Resin
NAICS 325220 - Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2824 - Organic Fibers, Noncellulosic
Sales >$500,000,000
# of Employees 168
Plant Area (Sq.Ft.) 280,000
Annual Production 800,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $7,015,245 127,681,163 kWh $0.05
Electricity Demand $1,522,658 171,734 kW-months/year $8.87
Electricity Fees $831,150 - $ -
Natural Gas $4,618,080 1,014,730 MMBtu $4.55
TOTAL ENERGY COSTS $13,987,133
RECOMMENDED SAVINGS* $345,186 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $91,795
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$244,785
Cost:
$930,000
$237,315 4,696,167 $58,309 6,433 $18,001 - $(-68,840) (-14,906) $237,315
4,696,167
kWh
$58,309
6,433
kW-months/year
$18,001
-
$
$(-68,840)
(-14,906)
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$91,795
Cost:
$240,500
$91,676 1,814,143 - - $119 - - - $91,676
1,814,143
kWh
-
-
kW-months/year
$119
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,606
Cost:
$18,481
$5,606 110,927 $2,296 152 $704 - - - $5,606
110,927
kWh
$2,296
152
kW-months/year
$704
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$345,186
Cost:
$1,188,981
$334,597 6,621,237 $60,605 6,585 $18,824 - $(-68,840) (-14,906) $334,597
6,621,237
kWh
$60,605
6,585
kW-months/year
$18,824
-
$
$(-68,840)
(-14,906)
MMBtu
TOTAL IMPLEMENTED Savings:
$91,795
Cost:
$240,500
$91,676 1,814,143 - - $119 - - - $91,676
1,814,143
kWh
-
-
kW-months/year
$119
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas