IAC logo
IAC Assessment: MS0374
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0374
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2011
Principal Product Lumber
NAICS 321999 - All Other Miscellaneous Wood Product Manufacturing
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 98
Plant Area (Sq.Ft.) 150,000
Annual Production 25,000 Thousand Feet
Production Hrs. Annual 2,550
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $269,910 5,478,711 kWh $0.05
Electricity Demand $331,476 18,786 kW-months/year $17.64
Electricity Fees $(-38,518) - $ -
Wood $172,835 310,855 MMBtu $0.56
TOTAL ENERGY COSTS $735,703
RECOMMENDED SAVINGS* $86,369 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,537
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$57,503
Cost:
$375,001
$31,862 663,800 $57,348 3,240 $1,338 - $(-33,045) - $31,862
663,800
kWh
$57,348
3,240
kW-months/year
$1,338
-
$
$(-33,045)
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$13,956
Cost:
$12,825
$4,238 88,283 $9,452 534 $266 - - - $4,238
88,283
kWh
$9,452
534
kW-months/year
$266
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,534
Cost:
$285
$2,534 51,969 - - - - - - $2,534
51,969
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,632
Cost:
$16,560
$2,027 42,228 $3,522 199 $83 - - - $2,027
42,228
kWh
$3,522
199
kW-months/year
$83
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,392
Cost:
$10,340
$1,583 32,972 $2,744 155 $65 - - - $1,583
32,972
kWh
$2,744
155
kW-months/year
$65
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,329
Cost:
$771
$1,309 27,284 - - $20 - - - $1,309
27,284
kWh
-
-
kW-months/year
$20
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,023
Cost:
$7,463
$371 7,738 $637 36 $15 - - - $371
7,738
kWh
$637
36
kW-months/year
$15
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$86,369
Cost:
$423,245
$43,924 914,274 $73,703 4,164 $1,787 - $(-33,045) - $43,924
914,274
kWh
$73,703
4,164
kW-months/year
$1,787
-
$
$(-33,045)
-
$
TOTAL IMPLEMENTED Savings:
$27,537
Cost:
$47,473
$10,753 223,190 $16,355 924 $429 - - - $10,753
223,190
kWh
$16,355
924
kW-months/year
$429
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes