IAC logo
IAC Assessment: MS0433
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0433
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2024
Principal Product Refuse Trucks
NAICS 336211 - Motor Vehicle Body Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 210
Plant Area (Sq.Ft.) 250,000
Annual Production 310 Units
Production Hrs. Annual 2,125
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,222 1,251,240 kWh $0.08
Electricity Demand $54,143 6,016 kW-months/year $9.00
Electricity Fees $14,482 - $ -
Natural Gas $16,659 1,047 MMBtu $15.92
LPG $15,972 534 MMBtu $29.89
TOTAL ENERGY COSTS $201,637
RECOMMENDED SAVINGS* $76,809 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$750
Cost:
$393
$619 7,881 $131 15 - - $619
7,881
kWh
$131
15
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$647
Cost:
$1,821
$613 7,854 $33 4 - - $613
7,854
kWh
$33
4
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,497
Cost:
-
$5,497 72,833 - - - - $5,497
72,833
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$48,250
Cost:
$482,125
$48,250 643,337 - - - - $48,250
643,337
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,443
Cost:
$4,229
- - $8,443 938 - - -
-
kWh
$8,443
938
kW-months/year
-
-
MMBtu
06: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$13,222
Cost:
$50,000
$(-2,751) (-35,040) - - $15,972 534 $(-2,751)
(-35,040)
kWh
-
-
kW-months/year
$15,972
534
MMBtu
TOTAL RECOMMENDED Savings:
$76,809
Cost:
$538,568
$52,229 696,865 $8,607 956 $15,972 534 $52,229
696,865
kWh
$8,607
956
kW-months/year
$15,972
534
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG