IAC logo
IAC Assessment: MS0447
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0447
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2025
Principal Product Plastic Pour Bottles
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 1,000,000
Annual Production 70,000,000 Units
Production Hrs. Annual 8,736
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,359,463 50,544,648 kWh $0.05
Electricity Demand $990,211 86,825 kW-months/year $11.40
Electricity Fees $(-101,782) - $ -
Natural Gas $1,464,164 321,981 MMBtu $4.55
TOTAL ENERGY COSTS $4,712,055
RECOMMENDED SAVINGS* $3,023,439 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$668,474
Cost:
$6,707,386
$452,100 9,619,143 $216,374 18,980 - - - - $452,100
9,619,143
kWh
$216,374
18,980
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$80,000
Cost:
$30,005
- - - - - - $80,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$80,000
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$56,915
Cost:
$6,958
$56,915 1,210,957 - - - - - - $56,915
1,210,957
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$43,724
Cost:
$145,930
- - - - $43,724 9,609 - - -
-
kWh
-
-
kW-months/year
$43,724
9,609
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$144,047
Cost:
$116,128
$144,047 3,064,830 - - - - - - $144,047
3,064,830
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$2,030,279
Cost:
$11,484,200
$2,359,463 50,544,648 $990,211 86,860 $(-814,948) (-178,923) $(-504,446) - $2,359,463
50,544,648
kWh
$990,211
86,860
kW-months/year
$(-814,948)
(-178,923)
MMBtu
$(-504,446)
-
$
TOTAL RECOMMENDED Savings:
$3,023,439
Cost:
$18,490,607
$3,012,525 64,439,577 $1,206,585 105,840 $(-771,224) (-169,314) $(-424,446) - $3,012,525
64,439,577
kWh
$1,206,585
105,840
kW-months/year
$(-771,224)
(-169,314)
MMBtu
$(-424,446)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost