IAC logo
IAC Assessment: MS0448
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0448
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2025
Principal Product Military Vehicles
NAICS 336992 - Military Armored Vehicle, Tank, and Tank Component Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $50,000,000-$100,000,000
# of Employees 166
Plant Area (Sq.Ft.) 650,000
Annual Production 832 Units
Production Hrs. Annual 2,128
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $490,178 3,559,300 kWh $0.14
Electricity Demand $219,101 13,738 kW-months/year $15.95
Electricity Fees $25,992 - $ -
Natural Gas $53,715 10,965 MMBtu $4.90
LPG $34,082 1,072 MMBtu $31.80
Other Gas $9,847 468 MMBtu $21.04
TOTAL ENERGY COSTS $838,403
RECOMMENDED SAVINGS* $324,237 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Other Gas Electricity Usage Electricity Demand Natural Gas LPG Other Gas
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$217,439
Cost:
$973,557
$188,649 1,370,000 $28,790 1,800 - - - - - - $188,649
1,370,000
kWh
$28,790
1,800
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$48,357
Cost:
$35,751
$(-158) (-1,129) - - $48,515 9,801 - - - - $(-158)
(-1,129)
kWh
-
-
kW-months/year
$48,515
9,801
MMBtu
-
-
MMBtu
-
-
MMBtu
03: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$10,741
Cost:
$15,697
- - - - $10,741 2,192 - - - - -
-
kWh
-
-
kW-months/year
$10,741
2,192
MMBtu
-
-
MMBtu
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,225
Cost:
$34,284
$14,643 104,595 $582 37 - - - - - - $14,643
104,595
kWh
$582
37
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
05: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$24,271
Cost:
$200,000
$(-9,811) (-70,080) - - - - $34,082 1,072 - - $(-9,811)
(-70,080)
kWh
-
-
kW-months/year
-
-
MMBtu
$34,082
1,072
MMBtu
-
-
MMBtu
06: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$8,205
Cost:
$72,000
$(-1,642) (-11,727) - - - - - - $9,847 468 $(-1,642)
(-11,727)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$9,847
468
MMBtu
TOTAL RECOMMENDED Savings:
$324,237
Cost:
$1,331,289
$191,681 1,391,659 $29,372 1,837 $59,256 11,993 $34,082 1,072 $9,847 468 $191,681
1,391,659
kWh
$29,372
1,837
kW-months/year
$59,256
11,993
MMBtu
$34,082
1,072
MMBtu
$9,847
468
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas LPG Other Gas Electricity Usage Electricity Demand Natural Gas LPG Other Gas